OUR SERVICES
|
|
Pipeline Services : Track Records
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Provision of Engineering, Procurement, Fabrication,Installation,Commissioning and Maintenance Work of Pig Trap System. |
Details Engineering Design,Procure,Supply,Fabricate,Install,Inspect,Test and Commissioning of Pig Trap System. |
PETRONAS Carigali Sdn Bhd. |
Sabah |
Various Size from 3" Pipeline to 42". |
Provision of Auxuliary Pumping Services. |
Auxiliary Pumping Services for pipeline including Deoiling, Degassing, Intelligent Pigging, Dewatering,Nitrogen Purging, and assist recommissioning. |
Sabah Shell Petroleum Company Limited. |
Sabah |
6"Pipeline,8"Pipeline ,10"Pipeline,12"Pipeline |
Provision for Hook Up , Commissioning and Topside Major Maintenance Services for 2013 - 2018. |
Provision of manpower, equipment, and consumables for Dewatering. Drying and N2 Purge of 10" TA -A to TA -C Gas Injection Line at Tapis Platform. |
Kencana HL Sdn Bhd. |
Terengganu |
10"x 4km TA-A to TA-C . |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Provision of testing and Pre-Comm Services of pipelines, spools and risers for SSB F14 and F29 Gas Field Development Project. |
Provision of Testing and Precomm services of Pipelines, Spools and Risers. |
EMEPMI / TL Offshore |
Sabah |
20” x 30km F23RA / F14DRA, 12” x 21km F23RA / F29. |
Provision of Pipeline Pre-Comm Services for Bulan-C |
Provision of manpower and Equipment for execution of Leak Testing, Nitrogen Purging and Preservation for Brownfiled Booster Compression Project at Hess Cakrawala Field. Work also include Host Tie in Work at Bulan-C site. |
Carigali HESS. |
Kelantan |
Topside piping activities |
Provision of Pipeline Pre-Commissioning Services for Cendor Field Development Project. |
Pipeline Flooding, Hydro testing, Bulk Dewatering, Nitrogen Packing & De-oiling. |
Petrofac / Sapura Kencana. |
Terengganu |
12” & 8” PL CDW-C to FPSO, 12” & 8” PL CDW-B to FPSO, 8” Flexible Riser FPSO riser FPSO to PLET West Desaru, 8” PL WSS to FPSO. |
Provision of Pre-Commissioning Services for Pipeline 28” x 282km PLTS to TGAST Beach Valve EVA-NMB Gas Delivery System. |
Pipeline Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Vacuum Drying, Nitrogen Packing & Leak Test Spool. |
PETRONAS Carigali Sdn Bhd / GOM Resources Sdn bhd |
Terenganu |
28” x 282km PLTS to TGAST 24” x 72km PLTS to MRP. |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Provision of Dewatering, Drying & Dry Preservation of 14” & 24 “ KBB PL for Kebabangan Northern Hub |
Dewatering, Drying, Nitrogen Purging, Leak Test. |
KPOC |
Sabah |
14” x 123km KBB to SOGT (Oil) 24” x 123km KBB to SOGT (Gas) |
Provision of Dewatering of Oil Export Pipeline for Gumusut Kakap Project. |
Dewatering Startup Commissioning. |
Sabah Shell Petroleum |
Sabah |
18 x 202km FPS to SOGT |
PCSB MSA Projects with SKO/SBO/PMO |
Deoiling, Degassing, Assist IP pumping, Dewatering, Assist Commissioning |
PCSB |
SKO/SBO/PMO |
Various sizes & length |
Pipeline De-Commissioning, Dewatering & Assist Commissioning |
Cleaning, Gauging, Filling, Hydrotest, Assist Commissioning. |
PCSB / Anticorrosion Protective System(M)S/B |
Terengganu |
8" x 1.2KM SMP-A to SMJT-E |
Provision Of Testing, Pre-Commissioning & Commissioning Assistance Services Of Pipeline , Spools & Riser For Moc 2013 Project |
Pigging, Cleaning, Gauging, Filling, Hydrotest & Nitrogen Packing. |
MOC / Sapura Kencana |
Sarawak |
18" x 17KM SAP-A to S.PLEM, 10" x 40KM PRPA to SAPA, 16" x 15.3KM SAPA to SEPA, 16" x 8KM BESA to SNPA. |
Pipeline Pre-Commissioning |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Bulk Dewatering, Final Dewatering, Air Drying, Nitrogen Purging & Packing. |
HESS / Global Offshore |
Terengganu |
16" x 53KM FPSO To Kamelia To Lawit-A Platform |
Kinabalu field pipeline project (2nd Phase) |
Dewatering, Vacuum & Nitrogen Packing |
PCSB / Global Offshore |
Sabah |
24" x 140km KNPG-B / SOGT |
Kinabalu field pipeline project |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, (Optional: Dewatering, Air Drying, N2 packing) |
PCSB / Global Offshore |
Sabah |
24" x 140km KNPG-B / SOGT, 18" x 2km KNJT-C / KNPG-B |
EMEPMI Telok / Tapis Pipeline Development Project |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying , N2 packing |
EMEPMI / TL Offshore |
Terengganu |
16" x 5.6km Ta-A / Ta-Q (FWS), 14" x 5.9km Ta-E / Ta-Q (FWS), 12" x 5.6km Ta-A / Ta-Q (GI), 10" x 3.6km Ta-P / Ta-Q (crude), 10" x 4.0km Ta-C / Ta-A (GI), 18" x 1.6km Gu-E tie in / Ta-Q (Gas), 18" x 1.6km Gu-E tie in / Ta-Q (NAG), 18" x 9.3km Ta-C / Ta-Q (FWS), 28" x 26.5km Te-A / Gu-E (FWS) |
LEKAS |
Cleaning, Pneumatic strength test, Inerting, Leaktesting, Flange management. Scopes by others (Cooldown - PNS, Barge - Subsea, Propane transfer - Subsea) |
Petronas Gas Berhad / IGS / Subsea |
Melaka |
Cryogenic piping systems |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Provision of DPDSV for Kebabangan field pipeline project |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering (OPTIONAL:Provision of DPDSV) |
KPOC / Global Offshore |
Sabah |
24" x 125km KBB / SOGT, 14" x 125km KBB / SOGT |
SKO Pipeline Replacement Project |
Cleaning, Gauging, Filling, Hydrotesting, Assist IP & Assist ommissioning |
PCSB / TL Offshore |
Sarawak |
18" x 32km TEP-B/BCOT, 12" x 1.2km BADP-G/BAP-AA, 12" x 15km BNP-A/BADB-B |
Cendor / West Desaru Field Development |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying, Vacuum Drying, N2 packing |
Petrofac / TL Offshore |
Terengganu |
8" x 13.7km WD/PLET, 8" x 1.6km CDP-A/CDW-B (gas), 8" x 1.6km CDP-A/CDW-B (WI), 8" x 3.3km CDP-A/CDW-B (WI), 8" x 3.3km CDP-A/CDW-B (gas), |
PMO Pipeline Replacement Project |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Assist IP run |
PCSB PMO / Global Offshore |
Terengganu |
PMO PL73: 6’’x 7km BEKOK-A – TIONG-A |
New field development? |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Bulk Dewatering, assist commissioning |
AMC / TL Offshore IBD / IEV Group |
Terengganu |
10" X 14 km D35R-A to D21JT-A |
KANOWIT Subsea System Development Project |
Leak Testing, Assist run Gauging & Caliper, MFL, Dewatering, Nitrogen Packing and Production Pigging (optional) |
PCSB / Subsea 7 |
Sarawak |
24 x 4.71 KM SS PLET / KAKG-A???????? 2 x 12” x 0.154 KM SS PLET / KASS-2 & KASS-1 |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
De Oiling / De Gassing, HT, Dewatering , N2 Pack |
PCSB-SKO |
Offshore, Sarawak |
PL191 8" x 0.842KM TKJT-C to TKP-B |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
De Oiling / De Gassing, HT, Dewatering , N2 Pack |
PCSB-SKO |
Offshore, Sarawak |
PL195 6" x 0.317KM TKJT-D to TKJT-C |
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) |
Provision of HT for Barred Tee Spool? for PMOPL20: 6" TiA-TiB at Tiong B platform upon completion of composite material strengthering repair |
PCSB PMO |
Offshore, Terengganu |
(WOR 2012/13) PMOPL20: 6" x km TiA-TiB |
EMEPMI Brownfield - Gu-A Gas Lift Riser Replacement |
N2 purging prior cutting & re-purging after repair |
EMEPMI / Ranhill Worley |
Offshore, Terengganu |
6" x 4km Gu-A / Gu-B |
EMEPMI Integrity Check - Pipeline Leak |
Leak testing after repair works |
EMEPMI |
Offshore, Terengganu |
12" x 10km Tap-E / Tap-A |
Bumi-B & Cakerawala-D Pipeline Installation (CH2012) |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying (optional), Vacuum Drying (optional), N2 packing (optional) |
Carigali HESS / TL Offshore IBD |
Offshore, Terengganu |
24” X 6.4 KM BM-B / BM-A WET GAS CRA 10” X 3.9 KM CK-D / CK-C FWS GAS CRA |
Murphy 2012-2014 Pipeline Program |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering (optional) |
Murphy Oil Corporation / TL Offshore Sdn Bhd |
Offshore, Sarawak |
SKPL29: 8"x13.1km PTSA / WPPA, SKPL27: 8"x8.78km SNPA / Subsea Y-Piece, SKPL28: 20"x8.51km SNPA / Subsea Y-Piece |
Berantai Field Development |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, MEG Swabbing, N2 packing |
Petrofac / TLO |
Offshore, Terengganu |
Rigid line: 12" x 30KM Andr-A / PLET |
Berantai Field Development |
Cleaning, gauging, filling, hydrotesting |
Petrofac / TLO |
Offshore, Terengganu |
8" x 1.3km BWHP / FPSO (crude oil)- flexible line |
Berantai Field Development |
Cleaning, gauging, filling, hydrotesting, optional : Dewatering, Vacuum Drying & N2 packing |
Petrofac / TLO |
Offshore, Terengganu |
12" x 1.3km BWHP / FPSO (LP gas) - flexible line |
Berantai Field Development |
Cleaning, gauging, filling, hydrotesting, optional : Dewatering, Vacuum Drying & N2 packing |
Petrofac / TLO |
Offshore, Terengganu |
12" x 1.3km BWHP / FPSO (HP gas) - flexible line |
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) |
Provision of decommissioning activities for PMOPL 18: in assisting SDV870 @BeB and SDV845 @ BeA |
PCSB PMO |
Offshore, Terengganu |
(WOR 2012/11) PMOPL18: 6" x4.6km BeB-BeA |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
De Oiling / De Gassing, HT, Dewatering , N2 Pack? |
PCSB-SKO |
Offshore, Sarawak |
PL201 6" x 1.281KM TKJT-F to TKP-A |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
De Oiling / De Gassing, HT, Dewatering , N2 Pack? |
PCSB-SKO |
Offshore, Sarawak |
PL15 6" x 0.374KM BA-18 to BADP-C |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
De Oiling / De Gassing |
PCSB-SKO |
Offshore, Sarawak |
PL13 8" x 2.446km BADP-C to BAP-A |
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) |
Decommissioning & Assist IP |
PCSB PMO |
Offshore, Terengganu |
(WOR 2011/15) PMOPL37: 14" x 1.8km MLJTA-FPSO |
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) |
Decommissioning & Assist IP |
PCSB PMO |
Offshore, Terengganu |
(WOR 2012/04) PMOPL29: 12" x2.0km TiA-TiB |
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) |
Decommissioning & Assist IP |
PCSB PMO |
Offshore, Terengganu |
(WOR 2011/22) PMOPL64: 8" x 2km FSO-ABU-A |
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) |
Decommissioning & Assist IP |
PCSB PMO |
Offshore, Terengganu |
(WOR 2011/07) PMOPL65: 6" x 2km FSO-ABU |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, IP Assist, Assist Dewater |
PCSB SBO |
Offshore, Sabah |
PL121:8" x 1.2km SMJT-E/SMP-A,? PL122:6" x 1.2km SMJT-E/SMP-A, PL113:6" x 1.0 km SMJT-D/SMJT-C, PL114:6" x 0.7 km SMJT-F/SMJT-C, PL116:6" x 0.6 km SMJT-D/SMJT-F, PL117:6" x 0.6 km SMJT-F/SMJT-D, PL118:6" x 0.6 km SMJT-F/SMJT-D, PL127:6" x 0.64 km SMJT-C/SMJT-D, PL115:6" x 1 km SMJT-D/SMJT-C crude oil, PL111:6" x 1.0 km SMJT-C/SMJT-D , PL276:8" x 3.0 km EWDP-B/EWP-A |
Kebabangan field pipeline project |
Partial dewatering of shore approach pipeline prior to continue laying |
KPOC / GOM |
Offshore, Sabah |
24" x 800m & 14" x 800m Shore approach pipeline SOGT to offshore |
PL107 Beach Valve Replacement (MSA) |
Degassing, Valve Dismantle/Installation, Assist Dewatering |
PCSB SBO |
Offshore, Sabah |
PL 107 14’’ x 46.0 KM Gas Trunk Line SMG-A to LGAST |
Intergrity testing of Manuli flexible line of Cendor MOPU |
Hydrotesting |
Petrofac / Blackgold |
Offshore, Terengganu |
?6" x 960m from Cendor MOPU to FSO |
PCSB Resak Pipeline Re-cleaning |
Drilling mud removal, Assist IP run, Topside leaktesting and Assist Commissioning |
PCSB / GOM |
Offshore, Terengganu |
24" x 54km TBDR-A / RDP-A |
Cilipadi Gas Field Development Project |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying, Vacuum Drying, N2 packing |
Sarawak Shell Berhad / TL Offshore |
Offshore, Sarawak |
16" x 30km Wet Gas PL CPDR-A / F23R-A, 24" x 26km Wet gas PL F28DR-A / F6K-A |
PCSB Transportation and Installation of Offshore Facilities |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Onshore, Terengganu |
24" x 166km ANDRA/TCOT |
Decommissioning & Commissioning for SDV840 change-out (MSA) |
Deoiling & Assist commissioning |
PCSB-PMO |
Offshore, Terengganu |
(WOR 2011/21) PMOPL28: 12" x 28.8km TiA-TaP |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Assist dewatering / commissioning |
PCSB-SKO |
Offshore, Sarawak |
WO#18: PL-365, 12" x 1.3 km BADP-G/BAP-AA |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Assist IP pumping |
PCSB-SKO |
Offshore, Sarawak |
WO#04: PL329 (24" x 155km HIP/B11DR-A), PL340 (10" x 1.85km WLDP-C/WLP-A) |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling |
PCSB-SKO |
Offshore, Sarawak |
PL89 (6" x 1.0km FBJ-29/FBPP-1);PL90 (6" x 1.0km FBJ-29/FBPP-1) |
PCSB PMO Pipeline Integrity inspection (WOR 2011/01) (MSA)? |
Doiling, Hydrotest, Assist IP and Assist Comm |
PCSB-PMO |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
(WOR 2011/01) PMOPL20: 6" x 1.7km TiA-TiB |
N2 Inerting at Kumang (MSA) |
N2 Pallet Supply (rental) |
PCSB-SKO |
Offshore, Sarawak |
Kumang topside |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
IP Assist (No auxiliary pumping) |
PCSB-SKO |
Offshore, Sarawak |
PL266, 18" x 125km BNG-B / E11R-A |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, Dewater, Drying, N2 Purge |
PCSB-SKO |
Offshore, Sarawak |
PL74, 8" x 7.3km BEP-A/BOP-A |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling (decomm) |
PCSB-SKO |
Offshore, Sarawak |
PL64, 12" x 17.9km BEP-A/BKP-A |
SSB pipeline intergrity inspection |
InVista IP Run (Auxiliary Pumping)?? |
Sarawak Shell Berhad |
Offshore, Sarawak |
8" x 453m SJJT-A/SJP-A |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoil, OP, assist dewatering |
PCSB-SKO |
Offshore, Sarawak |
PL-192 (10" x 0.84 km TKJT-C/TKP-B Crude Oil Pipeline) |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Energency flushing of TCOT effluent lines (MSA) |
Back-flushing of effluent lines |
PCSB-PMO |
Onshore, Terengganu |
10" x 1km x 2 pipelines |
SBM 5 Centre Well Crude Oil Draining (emergency) - (MSA) |
Draining of crude oil spills from SBM centre well |
PCSB-SKO |
Offshore, Sarawak |
SBM system |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, Assist IP, Assist Dewater |
PCSB-SKO |
Offshore, Sarawak |
a. PL273, 6" x 9.0 km BYDP-C/BYP-A FL Pipeline |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Assist IP, Assist Dewater |
PCSB-SKO |
Offshore, Sarawak |
b. PL274, 6" x 9.0 km BYDP-C/BYP-A FL Pipeline |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, Hydrotest, Assist Dewater |
PCSB-SKO |
Offshore, Sarawak |
PL341 (16" x 31.4 km BAP-AA/MCOT Crude Oil Pipeline) |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Degassing, IP Assist, Assist Dewatering |
PCSB-SBO |
Offshore, Sarawak |
PL281, 10" x 17.3km SUPG-B to SMG-A (Sumandak) |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Degassing, Assist IP, Drying, N2 Pack |
PCSB-SKO |
Offshore, Sarawak |
PL-352 (6" x 0.6 km FBJT-3/FBPP-1 Gas Pipeline) |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Deoil, Assist IP, Assist dewater |
PCSB-SKO |
Offshore, Sarawak |
PL 344 (16’’ X 4.1 km BAJT-H / BAKP-B CRUDE OIL PIPELINE) |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
IP, Assist Assist Dewater |
PCSB-SBO |
Onshore, Labuan |
a. PLxxx (6" x 700m GRT1/GRT2 Condensate Pipeline) |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Degas, IP, Dewater, Drying, N2 pack |
PCSB-SBO |
Onshore, Labuan |
b. PLxxx (8" x 700m GRT1/GRT2 Fuel Gas Pipeline) |
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) |
Degas, Gauging, HT, IP, Dewatering, Drying, N2 Pack |
PCSB-SKO |
Offshore, Sarawak |
PL-279 (10" x 24.7 km BOK-A/BNG-B Gas Pipeline) |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Degassing, Assist IP, Assist Dewater |
PCSB-SBO |
Offshore, Sabah |
a. PL119 (6" x 1.2km SMP-A/SMJT-E Gaslift Pipeline) |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, Assist IP, Assist Dewater |
PCSB-SBO |
Offshore, Sabah |
b. PL121 (8" x 1.2km SMP-A/SMJT-E Oil Pipeline) |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, Assist IP, Assist Dewater |
PCSB-SBO |
Offshore, Sabah |
c. PL122 (6" x 1.2km SMP-A/SMJT-E Oil Pipeline) |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Degassing, Assist IP, Assist Dewater |
PCSB-SBO |
Offshore, Sabah |
PL128, 6" x 0.64km SMJT-E/SMJT-G Gaslift Pipeline |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Deoiling, Assist IP, Assist Dewater |
PCSB-SBO |
Offshore, Sabah |
PL139 (rerun), 8" x 4.5km SMP-B/SMR-A Gas Pipeline |
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) |
Degassing, Assist IP, Assist Dewater |
PCSB-SBO |
Offshore, Sabah |
PL120 (6" x 1.2km SMP-A/SMJT-E Gas HP Pipeline) |
SKO Baram Topside Modification |
Deoiling, Hydrotesting, Optional (Dewatering, reinstatement testing, Assist Commissioning) |
PCSB / Carimin |
Offshore, Sarawak |
PL6 6"x2.4km, PL7 6" x 0.4km, PL14 8" x 2.5km, PL17 6" x 1.9km |
Newfiled Pipeline |
Cleaning, Gauging, Filling & Hydrotesting |
Newfield / Global Offshore |
Offshore, Terengganu |
10" x 25 km Ting-A / Ti-A |
SKO Bokor Topside Modification |
Deoiling, Hydrotesting |
PCSB / Petra Resources |
Offshore, Sarawak |
PL75 6" x 0.6km |
PC4 / B11 Pipeline Re-precommissioning and IP run |
H2S removal, Mud removal, Dewatering, Drying, N2 packing |
PCSB SKO / Global Offshore |
Offshore, Sarawak |
12" x 23 km PC4 / B11 |
Puteri Heated Pipe in Pipe System |
Cleaning, Gauging, Filling, Hydrotesting, and spool testing |
Newfield / TL Offshore |
Offshore, Terengganu |
8" x 13km Puteri - PLEM 12" x 13km Puteri - PLEM 4" x 13km Puteri-PLEM |
Kumang Cluster Pipeline Project |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying, Vacuum Drying, Assist Caliper Pigging |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
18"x21km KUJTA/KAKGA, 28"x57km F9JTA/KAKGA & 28"x190km MLNG SC2/KAKGA |
PCPP Transportation and Installation of Offshore Facilities |
Flooding, Cleaning, Gauging, Filling, Hydrotesting and Assist Commissioning |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
10"x6km DANA/PLEM |
East Piatu Development Project |
Cleaning, Gauging, Filling, Hydrotesting |
Newfield / TL Offshore |
Offshore, Terengganu |
2 nos PL 8" x 15km Gas & Crude East Piatu CPP / Larut-A |
Bekok pipeline dewatering |
Dewatering, Drying & N2 packing |
PCSB PMO |
Offshore, Terengganu |
8" x 5km Be-A / Be-C |
PCSB PMO Pipeline sectional replacement |
Cleaning, Gauging, Filling, Hydrotesting, and spool testing of new pipeline ; decommissioning of old pipeline & assist commissioning |
PCSB PMO |
Offshore, Terengganu |
12" FWS x 60 km Pu-A / Ta-A |
Year 2010 Integrated Transportation and Installation of Offshore Facilities |
Cleaning, Gauging, Filling, Hydrotesting, Scope temp. cancelled : Dewatering, Air Drying, Vacuum Drying and Nitrogen Packing |
Petronas Carigali Sdn Bhd / Global Offshore Malaysia Sdn Bhd |
Offshore, Terengganu |
24"x52km, 24"x28km and 1no 16"x18km |
PCSB SKO Pipeline Integrity Inspection Programme |
Deoiling, Degassing, Assist Intelligent Pigging, Dewatering, Drying and Nitrogen Packing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL344: 16"x3.8km BAJTH/BAKPB |
Petronas Dagangan KLIA Aviation Fuel Rejuvenation |
Cleaning |
Petronas Dagangan Berhad / Total Maintenance Resources Sdn Bhd |
KLIA, Sepang |
24"x300m |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
PCSB SBO Pipeline Integrity Inspection Programme |
Auxiliary Pumping to Assist Intelligent Pigging |
Petronas Carigali Sdn Bhd - SBO |
Offshore, Sabah |
PL143: 12"x2.3km |
Transportation and Installation 2010 for SSB/SSPC - St Joseph |
Cleaning, Gauging, Filling and Hydrotesting |
Sarawak Shell Berhad / TL Offshore Sdn Bhd |
Offshore, sabah |
2nos 8"x2.2km |
PCSB SKO Pipeline Integrity Inspection Programme |
Deoiling, Degassing, Assist Intelligent Pigging, Dewatering, Drying and Nitrogen Packing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL330: 14"x13.7km FBPP1/BAPAA, PL331: 10"x13.9km FBPP1/BAPAA, PL338: 8"x3.7km D35JTC/D35RA |
PCSB SBO Pipeline Integrity Inspection Programme |
Auxiliary Pumping to Assist Intelligent Pigging |
Petronas Carigali Sdn Bhd - SBO |
Offshore, Sabah |
PL108, PL109, PL110 & PL129: 8"x1.8km SMJTC/SMPA |
SKO Pipeline Replacement (new pipeline) |
Cleaning, Gauging, Filling, Hydrotesting |
PCSB SKO / TL Offshore Sdn Bhd |
Offshore, Sarawak |
PL 353 : 12" x 22km / PL 363 : 16" x 1.2km |
SKO Pipeline Replacement PL357 - PL355 |
Deoiling, Cleaning,Gauging, Filling, Hydrotesting, Assist Intelligent Pigging, Dewatering, Drying and Nitrogen Packing |
Petronas Carigali Sdn Bhd - SKO / TL Offshore Sdn Bhd |
Offshore, Sarawak |
PL357: 18"x18km BER-A / BNG-B |
Pipeline Cleaning and Deoiling (Phase 1) |
Bulk Oil Recovery and Deoiling |
ExxonMobil Exploration and Production Malaysia Incorporated |
Offshore, Terengganu |
18"x2.5km SmkA/SmkB, 16"x 4.5km SeD/SeC, 16"x3.6km SeC/SeA & 16"x 2.8km SeC/SeA. |
PCSB PMO Angsi Reflooding & Preservation |
Cleaning, Gauging, Filling, Hydrotesting & Dewatering cum Assist Commissioning |
Petronas Carigali Sdn Bhd / Global Offshore Malaysia Sdn Bhd |
Offshore, Terengganu |
Various sizes topside piping |
SKO Pipeline Replacement (new pipeline) |
Topside leak testing (additional work) |
Petronas Carigali Sdn Bhd - SKO / Petra Energy |
Offshore, Sarawak |
PL 300 : 10" x 22km / PL 299 : 10" x 22km & PL 70 : 12" x 1.2km |
SKO Pipeline Replacement (Old pipeline) |
Deoiling, Flushing |
PCSB SKO / TL Offshore Sdn Bhd |
Offshore, Sarawak |
PL330: 14"x13.7km FBPP1/BAPAA, PL331: 10"x13.9km FBPP1/BAPAA |
Talisman Pipeline Riser Replacement |
Flooding, Cleaning, Gauging, Filling, Hydrotesting, assist dewatering cum N2 drying |
Talisman-Energy Malaysia Ltd / Offshore works (OCE) |
Offshore, Terengganu |
4" x 3.5 km BR-B / BS-A |
Year 2010 Integrated Transportation and Installation of Offshore Facilities |
Flooding, Cleaning, Gauging, Filling & Hydrotesting |
ExxonMobil Exploration and Production Malaysia Incorporated / TL Offshore Sdn Bhd |
Offshore, Terengganu |
12"x2.5km SmkA/SmkB, 12"x 4.5km SeD/SeC, 12"x3.6km SeC/SeA & 12"x 2.8km SeC/SeA. |
PCSB PMO Bekok Pipeline Replacement |
Cleaning, Gauging, Filling, Hydrotesting & Dewatering cum Assist Commissioning |
Petronas Carigali Sdn Bhd / Global Offshore Malaysia Sdn Bhd |
Offhore, Terengganu |
6"x5km BeA-BeB |
EMEPMI Riser Repair Works |
N2 Purging to reduce LEL & O2 level |
EMEPMI |
Offhore, Terengganu |
8" x 8km Sm-A / Sm-B |
PCSB PMO Pipeline Repair |
Deoiling Flushing, Assirt Intelligent Pigging and Mothballing |
Petronas Carigali Sdn Bhd - PMO |
Offhore, Terengganu |
14"x14km ADJTA/FPSO |
Newfield Pipeline Leak Emergency |
Gel Pumping, Deoiling and Hydrotesting |
Newfield Peninsula Corporation |
Offhore, Terengganu |
10"x27km BEL-A/TING-A |
Year 2010 Integrated Transportation and Installation of Offshore Facilities |
Dewatering and Nitrogen Packing. |
Murphy Oil Corporation |
Offshore, Sarawak |
20"x39.7km SEPA/GORA |
West Belumut Development Project |
Cleaning, Gauging, Filling & Hydrotesting |
Newfield / TL Offshore Sdn Bhd |
Offshore, Terengganu |
10" & 4" x 10km WBWP/BelA |
Year 2010 Integrated Transportation and Installation of Offshore Facilities |
Cleaning, Gauging, Filling & Hydrotesting |
Murphy Oil Corporation / TL Offshore Sdn Bhd |
Offshore, Sarawak |
8"x19.5km SEPA/PLEM, 20"x39.7km SEPA/GORA, 8"x27.8km GORA/SEPA & 20"x27.8km MEPA/GORS |
Tangga Barat Critical System Leak Testing |
Nitrogen Leak Testing |
Kenchana HL Sdn Bhd |
Onshore, Perak |
6 Test Packages 100 - 400 barg Test Pressure |
PCPP Transportation and Installation of Offshore Facilities |
Flooding, Cleaning, Gauging, Filling, Hydrotesting and Assist Commissioning |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
16"x25km D35 / D30 MOPU |
PCSB SKO Pipeline Maintenance Programme |
Desanding, Deoiling, Assist Intelligent Pigging and Hydrotesting |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL344: 16"x3.8km BAJTH/BAKPB, PL192: 10"x0.85km TKJTC/TKPB |
PCSB SBO Pipeline Deoiling |
Deoiling and Degassing. |
Petronas Carigali Sdn Bhd - SBO |
Offshore, Sabah |
PL111: 6"x1km SMJTC/SMJTD, PL113: 6"x1km SMJTC/SMJTC, PL125: 8"x0.7km SMJTF/SMJTC & PL139: 8"x4.5km SMPB/SMRA |
PCSB SBO Pipeline Maintenance Programme |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SBO |
Offshore, Sabah |
PL186: 6"x3.3km TBGB/TBGA & PL275: 8"x3km EWDPA/EWPA |
PCSB SKO Pipeline Maintenance Programme |
Materials and Personnel to support Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL47: 12"x21km BNPA/BKPA, PL342: 10"x2km BAPB/BAPAA, PL357: 16"x12km BKPA/WLPA, PL293: 16"x51km D35RA/BYRA & PL60: 18"x55km BYPA/TEPB |
Nitrogen Purging for Pipeline Modification |
Nitrogen Purging |
Petronas Carigali Sdn Bhd - SBO |
Onshore, Sabah |
6"x1km |
Non-Routine Pigging of SBGAST-Powertron Gas Pipeline |
Operational Pigging Cleaning & Gauging |
Petronas Carigali Sdn Bhd - SBO |
Onshore, Sabah |
16"x10km |
Kikeh Deepwater Pipeline/Riser Development Project |
Flushing and Leaktesting of flexible riser |
Murphy oil Company / Technip Subsea 7 Pte Ltd |
Onshore, Sabah |
12"x1km PLEM / FPSO |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
EPCC Bintulu Upgrading of Bunkering Facilities |
Cleaning, Gauging, Filling & Hydrotesting |
Petronas Dagangan Berhad |
Onshore, Sarawak |
16" x 4km & 14"x1km |
Semarang Pipelines replacement project |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sabah |
2nos 6"x1km SMJTC/SMJTD, 8"x1km SMJTC/SMJTF & 8"x4.5km SMPA/SMRA |
Fairley Baram Pipeline Dewatering |
Dewatering, Drying & Nitrogen Packing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
6"x0.5km FBJT3/FBPP1 |
North Lukut subsea valve replacement Project |
Degassing |
Petronas Carigali Sdn Bhd - PMO |
Offshore, Terengganu |
8"x22km NLDPA/FPSO |
Guntong & Irong Barat Pipeline Cleaning Project |
Deoiling |
ExxonMobil Exploration & Production Malaysia Inc. |
Offshore, Terengganu |
12"x6km GuB/GuD & 6"x3.5km IBA/IBB |
SK309/3101 Phase 1 Gas Development Project |
Dewatering, Air Drying & Nitrogen Packing |
Murphy Oil Company |
Offshore, Sarawak |
20"x4km GOPB/GORA, 2nos 24"x36km GORA/BORF & 20"x1km MDP/MLNG2 |
SK309/3101 Phase 1 Gas Development Project |
Cleaning, Gauging, Filling & Hydrotesting |
Murphy Oil Company / Swiber Marine Sdn Bhd |
Offshore, Sarawak |
6"x2km WPPB/WPPA, 6"x4km GOPB/GORA, 8"x22km GORA/PLEM, 20"x4km GOPB/GORA, 2nos 24"x36km GORA/BORF, 8"x1km PLET/PLEM & 20"x1km MDP/MLNG2 |
PCSB SKO Pipeline Replacement Project |
Cleaning, Gauging, Filling & Hydrotesting |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
PL357: 16"x12km WLPA/BKPA |
PL11 Deoiling and Leak Testing |
Deoiling and Leak Testing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL11: 12"x10km BADPA/BAKB |
Bunga Orkid Development Project |
Flooding & hydrotesting of flexible risers |
Talisman Malaysia Limited / Franklin Offshore Pte Ltd |
Offshore, Terengganu |
4" & 10"x2.5km BOD/FSO |
Dulang Pipeline Replacement Project |
Deoiling, Cleaning, Gauging, Filling & Hydrotesting |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Terengganu |
6"x7km DLB/DLD |
Auxilliary Pumping to Assist Intelligent Pigging |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL332: 8"x2km BAJTH/BADPA |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Auxilliary Pumping to Assist Intelligent Pigging |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL299 & PL300: 10"x1.2km BADPE/BODPA |
PCSB SKO Pipeline Replacement Project |
Deoiling |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
PL333: 16"x12km WLPA/BKPA |
Transportation and Installation of Offshore Facilities for PCSB 2008 |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Terengganu |
6",10",12"x11km ANDRA/ANDPD |
Transportation and Installation of Offshore Facilities for PCSB 2008 |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
10"x52km D35RA/J4DRA, 10"x0.7km BOPB/BODPA, 12"x22km PC4DRA/B11DRA, 10"x21km BEPA/BKPA, 12"x1km BODPB/BODPC, 10x0.7km BOPB/BODPC |
Tukau Pipeline Leak |
Flushing and Leak testing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
Tukau Pipeline |
Descaling and Intelligent pigging Support for PL148 |
Auxiliary pumping to assist descaling and intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL148: 8" x 18km SIMPA/TKDPA |
Transportation and Installation of Offshore Facilities for SSB 2008 |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing |
Sarawak Shell Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
12"x5.2km F13/F13W & 14"x6.7km E11KA/SCDRA |
PL076 Flooding and Hydrotesting |
Flooding and Leak Testing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL076: 10"x0.7km BODPC/BOPA |
Auxilliary Pumping to Assist Intelligent Pigging |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL076: 10"x0.7km BODPC/BOPA |
Transportation and Installation of Offshore Facilities for PCSB 2008 |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sabah |
12"&16"x3.5km SUDPA/SUPGB, 4"x4.8km SUPGB/SUJTC, 10"x17.5km SUPGB/SMGA |
Semarang Field Development Project |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sabah |
4nos 8" x 2km SMJT-C to SMP-A |
Pl233 Pipeline abandonment |
Deoiling and riser removal |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
18"x12km WLPA/MCOT |
Deoiling of PL226 |
Deoiling |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL226:12"x13km WLDPC/MCOT |
Descaling and Intelligent pigging Support for PL215 |
Auxiliary pumping to assist descaling and intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL215: 10" x 1.1km TKPA/TKPB |
Guntong Pipeline Rejuvenation Project |
Deoiling |
ExxonMobil Exploration & Production Malaysia Inc. |
Offshore, Terengganu |
8"x3.5km GuC-GuA |
Auxilliary Pumping to Assist Intelligent Pigging |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL077: 12"x21km D18MPA/BYRA |
Intelligent pigging Support for PL292 |
Materials and Personnel to support Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL292: 12"8km D35RA/BYRA |
Puteri-Penara-Bunga Kertas Expansion Project |
Deoiling and Degassing. |
Petronas Carigali Sdn Bhd |
Offshore, Terengganu |
12" Crude & 8" Gas lift x 7km Penara to Bunga Kertas FPSO |
Flushing and Leak Testing PL13 & PL14 |
Flushing and Leak testing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL13 & PL14: 8"x2.5km BODPC/BAPPA |
Bunga Orkid Development Project |
Cleaning, Gauging, Filling, Hydrotesting and Dewatering. |
Talisman Malaysia Limited / Swiber Marine Pte Ltd |
Offshore, Terengganu |
24"x54km BrE/BoD, 18"x10km BoD/BoA, few nos 4", 8", 10", 12" & 14" of 5km |
PL233 Pipeline Emergency |
Spool Replacement Phase 2 |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL233: 18"x12km WLPA/MCOT |
Pulai-Tapis Rejuvenation Project |
Deoiling |
Petronas Carigali Sdn Bhd - PMO |
Offshore, Terengganu |
12"x60km PuA/TapA |
Puteri-Penara-Bunga Kertas Expansion Project |
Cleaning, Gauging, Filling, Hydrotesting and Dewatering. |
Petronas Carigali Sdn Bhd / Kenchana HL Sdn Bhd |
Offshore, Terengganu |
8" Crude & 8" Gas lift x 12km Puteri to Bunga Kertas FPSO |
Auxilliary Pumping to Assist Intelligent Pigging |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL332: 8" x 2km BAJTD/BAPAA |
Intelligent pigging Support for PL026 |
Materials and Personnel to support Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL026: 8"x1.8km BN14/BNPA |
Guntong Pipeline Rejuvenation Project |
Leak Testing |
ExxonMobil Exploration & Production Malaysia Inc. |
Offshore, Terengganu |
8"x3.5km GuC-GuA |
Intelligent pigging Support for PL339 |
Materials and Personnel to support Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL339: 18"x12km WLPA/MCOT |
Semarang Pipelines replacement project |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SBO |
Offshore, Sabah |
3 nos 8"x 3km pipelines |
Betty 4 Revisit Project |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering and Nitrogen Packing |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
18" x 18km BEP-A to BNG-A |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Transportation and Installation of Offshore Facilities for EMEPMI |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering and Nitrogen Packing |
ExxonMobil Exploration & Production Malaysia Incorporated / TL Offshore Sdn Bhd |
Offshore, Terengganu |
18" x 20km Gu-E to Tap-F and 16" x 6km CRA Jer-A to Jer-B |
EMEPMI Emergency Pipeline Leak Repair |
Hydrotesting after repair |
ExxonMobil Exploration & Production Malaysia Incorporated |
Offshore, Terengganu |
12" & 8" x 3.5km Gu-A to Gu-C |
PL233 Pipeline Emergency |
Spool Replacement Phase 1 |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL233: 18"x12km WLPA/MCOT |
Intelligent pigging Support for PL070 |
Materials, Instrument and Personnel to support Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL070: 12"x22km BEPA/BKPA |
LGAST Pipeline Project |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd / PBJV Group Sdn Bhd |
Onshore, Labuan |
12" x 10km LGAST-PML |
LGAST Pipeline Project |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd / PBJV Group Sdn Bhd |
Onshore, Labuan |
8" x 1km Fuel Gas & 6" x 1km Condensate Pipelines in PML |
Shell's 2007-2009 Transportation and Installation of Offshore Facilities |
Dewatering and Nitrogen Packing for CRA pipelines in 2007. |
Sabah Shell Petroleum Corporation / McDermott |
Offshore, Sarawak / Sabah |
20" x 6km, 28" x 9km, 10" x 12km & 10" x 5km F13 and M3 Fields |
Intelligent pigging Support for PL342 |
Materials, Instrument and Personnel to support Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL342: 10" BAPB/BAPAA |
Angsi Phase IV Pipelines Installation Programme 2007 |
Flooding and Preservation |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Terengganu |
10" & 8" x 5km ANDP-B to ANDP-D |
PCSB SKO Pipeline Maintenance Programme |
Auxiliary Pumping to Assist Intelligent Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL323: 10" & PL297: 8" x 2km BAJT-F to BAP-AA |
Auxilliary Pumping to Assist Intelligent Pigging |
Auxiliary pumping to assist intelligent pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL297: 8" & PL323: 10" x 2km BAJTF/BAPAA |
St Joseph Pipeline Replacement Project |
Bulk Oil Recovery, Deoiling and Cleaning |
Sabah Shell Petroleum Corporation / Petra Resources Sdn Bhd |
Onshore, Sabah |
20" x 19km SFPA-SJPA |
Betty 4 Revisit Project |
Pre-Flooding for Pipeline & Risers Subsea Tie-Ins |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
18" x 18km BEP-A to BNG-A |
Semarang Pipeline Emergency Repair |
Deoiling, Filling and Leak Testing |
Petronas Carigali Sdn Bhd |
Offshore, Sabah |
PL-113: 6" x 1km |
Transportation and Installation of Offshore Facilities for EMEPMI |
Riser Spools Leak Testing and Flooding for Subsea Tie-Ins |
ExxonMobil Exploration & Production Malaysia Incorporated / TL Offshore Sdn Bhd |
Offshore, Terengganu |
18" x 20km Gu-E to Tap-F and 16" x 6km CRA Jer-A to Jer-B |
Betty 4 Revisit Project |
Flooding and Preservation |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
18" x 18km BEP-A to BNG-A |
Temana Pipeline Emergency Repair |
Leak Testing, Leak Finding, Plidco Clamp Installation and Hydrotesting |
Petronas Carigali Sdn Bhd |
Offshore, Sarawak |
10" x 30km |
Dulang Field - FPSO Pipeline Change-Out |
Deoiling and Nitrogen Purging |
Petronas Carigali Sdn Bhd |
Offshore, Terengganu |
10" x 3km DL-B to FPSO |
PL233 Pipeline Emergency |
Leak Containment and Sectional Repair |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL233: 18"x12km WLPA/MCOT |
PCSB SKO Pipeline Maintenance Programme |
Baronia Emergency Pipeline Repair and Leak Testing |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL047: 12" x 21km BNP-A to BKP-A |
PCSB PMO Pipeline Maintenance Programme |
Deoiling, Dewatering and Commissioning |
Petronas Carigali Sdn Bhd - PMO |
Offshore, Terengganu |
10" x 7km DL-B to FPSO |
Intelligent Pigging for Baronia Pipeline. |
Scaffolding Deck Extension for launching and receiving of Intelligent Pigging. |
Petronas Carigali Sdn Bhd / H.Rozen (M) Sdn Bhd |
Offshore, Sarawak |
8" x 12km BNPA-BN24 |
Inspection Pigging Bayan-MLNG Project |
Supply gauge pig and personnel to assist pigs receipt and retrieval. |
Petronas Carigali Sdn Bhd |
Offshore, Sarawak |
18"x80km BYN-MLNG1 |
PCSB SKO Pipeline Maintenance Programme |
Assist Operational Pigging |
Petronas Carigali Sdn Bhd - SKO |
Offshore, Sarawak |
PL291: 18" x 86km BYR-A to MLNG1 |
West Lutong Pipelines Replacement Project |
Cleaning, Gauging, Filling and Hydrotesting. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd / PBJV Group Sdn Bhd |
Offshore, Sarawak |
10" x 2km WLDPA-WLDPB |
PCSB SBO Pipeline Maintenance Programme |
Engineering and Design of Permanent Pig Traps 6", 8" and 10" |
Petronas Carigali Sdn Bhd |
Sabah |
20 nos of pig traps |
Transportation and Installation of Offshore Facilities - Sumandak Pipeline Phase 2 |
Flooding and Preservation |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sabah |
10" & 4" x 4.5km SUPGB-SUJTC, 16" & 12" x 3.7km SUPGB-SUDPA, 8" x 4.5km SUJTC-SUPGB, 10" x 10km SMRA-SUPGB , 10" x 17.3km SMGA-SUPGB |
Baram MCOT Pipeline Replacement Project |
Cleaning, Gauging, Hydrotesting and Bulk Dewatering. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
10" x 1.3km BAPAA-BADPG (Flexible risers) |
Intelligent Pigging for Semarang Pipelines. |
Supply of equipment and personnel to assist Intelligent Pigging. |
Petronas Carigali Sdn Bhd / H.Rozen (M) Sdn Bhd |
Offshore, Sabah |
PL117: 6"x0.6km SMJTF-SMJTD, PL118: 6"x0.6km SMJTF-SMJTC, PL125: 8"x0.9km SMJTF-SMJTD & PL123: 8"x2.2km SMJTG-SMJTE |
Semarang Pipeline Repair & Rejuvenation Project. |
Cleaning, Flushing and Assist Pumping the Intelligent Pigging |
Petronas Carigali Sdn Bhd |
Offshore, Sarawak |
PL114: 6" x 0.7km SMJTF-SMJTC, PL119: 6"x1.2km SMPA-SMJTE, PL129: 6"x1.7km SMPA-SMJTC & PL147: 8"x1.6km SMPA-SMPC |
St Joseph - St Furious Development Project (Phase 2) |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Sabah Shell Petroleum Corporation / TL Offshore Sdn Bhd |
Offshore, Sabah |
10" & 20" x 15km SFPA-SFKA |
Semarang Pipeline Repair & Rejuvenation Project. |
Flushing Cleaning, Leak Testing, Dewatering, Drying & Nitrogen Packing. |
Petronas Carigali Sdn Bhd |
Offshore, Sarawak |
PL114: 6" x 0.7km SMJTF-SMJTC, PL119: 6"x1.2km SMPA-SMJTE, PL129: 6"x1.7km SMPA-SMJTC & PL147: 8"x1.6km SMPA-SMPC |
West Lutong Pipelines Replacement Project |
Cleaning, Gauging, Filling and Hydrotesting. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd / PBJV Group Sdn Bhd |
Offshore, Sarawak |
24" x 1.5km MCOT to open sea and 18" x 15km MCOT-WLDPA |
Intelligent Pigging for Semarang Pipelines. |
Retrieval of Stucked IP. |
Petronas Carigali Sdn Bhd / Romstar Sdn Bhd |
Offshore, Sabah |
PL114: 6" x 0.7km SMJTF-SMJTC & PL127: 6" x 0.8km SMJTG-SMJTE. |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Baram MCOT Pipeline Replacement Project |
Petronas Carigali Sdn Bhd/TLO (Sub-contractor to TLO) |
Pre-Comm And Commissioning - Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
|
16" x 33km MCOT-Baram Platform, Offshore Sarawk at 0 to 40m water depth |
PM3 - Ca Mau Gas Pipeline Project |
Provision for Hydrotesting, Pre-commissioning, Commissioning, Performance Test Run and Initial Operation |
PetroVietnam/VietSovPetro (As Sub-contractor to VSP) |
Onshore, Vietnam |
18" x 300 km Offshore Pipeline, Landfall Station, 18" x 27km Onshore Pipeline, MLV Station and Matering Station, flat terrain & Swampy, Ca Mau Province Vietnam. |
St Joseph - St Furious Development Project (Phase 1) |
Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Sabah Shell Petroleum Corporation / TL Offshore Sdn Bhd |
Offshore, Sabah |
8" & 10" x 2km SFJTB-SFJTE |
Sumandak Pipeline Precommissioning. |
Cleaning, Gauging, Filling, Hydrotesting and Bulk Dewatering. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
16" x 11.8km SMPB-SUDPA |
Intelligent Pigging for Semarang Pipelines. |
Supply of equipment and personnel to assist Intelligent Pigging. |
Petronas Carigali Sdn Bhd / Romstar Sdn Bhd |
Offshore, Sabah |
PL114: 6" x 0.7km SMJTF-SMJTC and PL127: 6" x 0.8km SMJTG-SMJTE. |
Abu Cluster Development Project |
Cleaning, Gauging, Filling & Hydrotesting of pipelines from platform to subsea PLEM. |
Petronas Carigali Sdn Bhd / APECS |
Offshore, Terengganu |
6" x 2km & 8" x 2km AbA-PLEM |
West Lutong Pipeline Abandonment Project |
Deoiling and preservation (in-place abandonment) of pipeline. |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
10" x 2km & 6" x 2km WLDPC-WLDPA |
PM3 - Ca Mau Pipeline Project |
Dewatering, Vacuum Drying, Nitrogen Packing, Gas-In & System Commissioning. |
PetroVietnam / VietSovPetro |
Onshore, Vietnam |
18" x 298km BRB-LFS & 18" x 27km LFS-GDS |
Bokor Pipeline Emergency Repair Project |
Deoiling Flushing & Leak Testing |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
10" x 1km BoA-BoD |
SeligiA-RayaA Pipeline Abandonment Project |
Deoiling and preservation (in-place abandonment) of pipeline. |
ExxonMobil Exploration & Production Malaysia Incorporated |
Offshore, Terengganu |
16" x 28km RaA-SeA |
B11-B12 Field Pipeline Development Project |
Cleaning, Gauging, Filling, Glycol Swabbing & Nitrogen Dewatering of CRA Clad Pipelines. |
Sarawak Shell Berhad / TL Offshore Sdn Bhd |
Offshore, Sarawak |
14" x 11km Subsea Wellhead-B11DRA & 8" x 25m Subsea Jumper |
West Lobe Pipeline Development |
Nitrogen Dewatering |
Premier Oil Natuna BV / Nippon Steel Corporation |
Offshore, Indonesia |
14" x 800m Subsea PLEM-WLWH Platform |
Baram MCOT Pipeline Replacement Project |
Cleaning, Gauging, Hydrotesting and Bulk Dewatering. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
10" x 11km BAPAA-BAPB |
SSB 2005 Offshore Installation Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Sarawak Shell Berhad / TL Offshore Sdn Bhd |
Offshore, Sarawak |
28" x 0.8km E11VB-E11PB & 28" x 42km E8DRA-E11PB |
ANDRA Platform Washdown Project |
Water Jetting and Manual Cleaning of Platform Structures and Topside System |
Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd |
Offshore, Terengganu |
ANDRA Platform |
Baram MCOT Pipeline Replacement Project |
Cleaning, Gauging, Hydrotesting and Bulk Dewatering. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
16" x 33km MCOT-BAPAA |
SDV Replacement Project |
Nitrogen and water pigging isolation for replacement of SDVs during shutdown and gas re-commissioning. |
Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd |
Offshore, Terengganu |
12" Masa, 18" Bekok C & 24" Duyong; to SCP |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Pulai A - Pulai B Pipeline Preservation Project |
Deoiling and Wet Preservation |
Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd |
Offshore, Terengganu |
4" x 2km PuA-PuB |
Baram South Pipeline Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
16" x 4km & 6" x 4km BAJTH-BAKPB |
Kepong A-Tiong A Pipeline Rejuvenation Project |
Deoiling and Hydrotesting |
Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd |
Offshore, Terengganu |
10" x 7km KeA-TiA |
Truck Tank Loading Rack Project |
Flushing and Hydrotesting |
Petronas Dagangan Bhd/ Baxtech Resources Sdn Bhd |
Onshore, Terengganu |
2" upto 8" various lengths |
NGDS to Keluang FL/DL |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd |
Onshore, Johor |
6" x 1km |
Baram Field Pipeline Repair Project |
Deoiling, Hydrotesting, Gauging and Intelligent Pigging. |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
PL11:12"x10km BADPA-BADPB |
Bakau-West Lutong Field Pipeline Abandonment Project |
Deoiling Flushing and Pigging |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
PL5:16” x 18km BKPA-WLPA |
West Lutong-MCOT Pipeline Abandonment Project |
Deoiling Flushing and Pigging |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
PL231:10" x 12.5km WLPA-MCOT |
Semarang Field Pipeline Repair Project |
Leak Finding |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore-Onshore, Sabah |
PL187:6" x 1.7km Gaslift Pipeline SMPC-SMPA |
Natural Gas Distribution System To Puchong DL Stage 1/05. |
Cleaning, Pneumatic Testing, Nitrogen Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd |
Onshore, Selangor |
PE pipe: 125mm x 835m & 63mm x 50m |
Natural Gas Distribution System to Parit Buntar FL Stage 1/05 |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd |
Onshore, Perak |
6” x 204m & 4" x 300m |
Pre-Commissioning of F13/E11K-A Pipeline |
Cleaning, Gauging, Hydrotesting, Air Drying, Nitrogen Packing and Intelligent Pigging |
Sarawak Shell Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
16” x 10.8km F13W to E11K-A |
Pre-Commissioning of Semarang LGAST Pipeline |
Dewatering, Air Drying, Nitrogen Slugging and Gas-In Commissioning. |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore-Onshore, Sabah |
PL107: 14” x 56km SMR-A to LGAST |
Pre-Commissioning Of Semarang LCOT Pipeline |
Cleaning, Gauging and Hydrotesting |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore-Onshore, Sabah |
PL144: 20” x 48km SMR-A to LCOT & PL133: 8" x 3.5km SMP-A to SMR-A |
Baram Field Crude Oil Evacuation |
Deoiling and Leak Testing of inter-field pipelines |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
6 nos of 8"x3km and 4 nos of 10"x3km |
Pre-Commissioning of Semarang LGAST Pipeline |
Degassing, Cleaning, Gauging and Intelligent Pigging |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore-Onshore, Sabah |
PL107: 14” x 56km SMR-A to LGAST |
Natural Gas Distribution System To Teluk Kalong FL Stage D3/04. |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd |
Onshore, Terengganu |
4” x 70m |
Natural Gas Distribution System To Kuantan Port FL Stage D3/04. |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd |
Onshore, Pahang |
4” x 468m |
Semarang Field Crude Oil Evacuation |
Deoiling and Preservation of inter-field pipelines and Topsides facilities |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sabah |
3 nos of 8” x 4km (PL133, PL133A, PL139), 1 no of 12"x4km (PL143) and SMP-A, SMR-A, SMP-B & SMP-C topsides |
Baram Field Pipeline Abandonment Project |
Deoiling Flushing and Pigging |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore-Onshore, Sarawak |
PL287: 16” x 40km BAP-AA to MCOT |
Baram Field Pipeline Repair Project |
Re-flooding and Hydrotesting |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
8” x 2.0km BAJT-D to BADP-A |
Natural Gas Distribution System To Seberang Prai FL1/DL1 |
Cleaning, Hydrotesting, Pneumatic, Dewatering, Swabbing, Air Drying, Nitrogen Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd |
Onshore, Penang |
8” x 700m Steel, 125mm x 1.8km & 90mm x 800m PE |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Bokor Field Pipeline Repair Project |
Deoiling Flushing and Pigging and Leak Testing |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
10” x 700m |
Enhanced Cleaning |
Cleaning Pigging and Intelligent Pigging |
Petronas Carigali Sdn Bhd / ExxonMobil Exploration & Production (M) Inc / GE Energy Sdn Bhd |
Offshore, Terengganu |
16" x 48km ANDR-A to Tapis-D |
Enhanced Cleaning, Tapis Platform |
Cleaning Pigging prior to Intelligent Pigging |
Petronas Carigali Sdn Bhd / ExxonMobil Exploration & Production (M) Inc / GE Energy Sdn Bhd |
Offshore, Terengganu |
Various Sizes Pipelines |
St Joseph Pipeline Recovery Project |
Hydrotesting |
Sarawak Shell Bhd / TL Offshore Sdn Bhd |
Offshore, Sarawak |
6” x 1.6km |
Baram Field Pipeline Repair Project |
Deoiling Flushing and Pigging and Leak Testing |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sarawak |
PL296: 10” x 2km BADP-A to BAP-AA |
Semarang Field Pipeline Abandonment Project |
Deoiling Flushing and Pigging and Intelligent Pigging |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore-Onshore, Sabah |
PL144: 18” x 48km SMR-A to LCOT |
Ruby-A Modification Project |
Chemical Cleaning and Leak Testing |
Petrovietnam / Petronas Carigali Sdn Bhd / Shapadu Energy & Engineering Sdn Bhd |
Offshore, Vietnam |
Various sizes and length topside pipings. |
Pulai Field Pipeline Rejuvenation Project |
Cleaning and Hydrotesting |
Petronas Carigali Sdn Bhd / GE Energy Sdn Bhd |
Offshore, Terengganu |
4” x 1.7km Pulai-A to Pulai-B |
Semarang Field Pipeline Repair Project |
Deoiling Pigging and Hydrotesting |
Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd |
Offshore, Sabah |
PL139: 8” x 4km SMR-A to SMP-B |
2004-2006 Transportation And Installation Of Offshore Facilities for PCSB - Pre-commissioning |
Cleaning, Gauging, Hydrotesting and Dewatering |
Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd |
Offshore, Sabah/Brunei |
14" x 14km, 10" x 14km and 8" x 8km |
Jintan Pipeline Re-Installation Project |
Hydrotesting and Dewatering with Nitrogen and Production Gas Commissioning |
Sarawak Shell Bhd / Nippon Steel & Construction (M) Sdn Bhd |
Offshore, Sarawak |
24” x 8km CRA Clad Pipeline M1DR-A to JNDR-A |
ANGSI Field Platform Washdown |
Water Jetting and Manual Cleaning of Platform Structures and Topside System |
Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd |
Offshore, Terengganu |
ANDP-C, ANDP-B and ANDP-E Platform |
Natural gas Distribution System To Cheng FL1/DL1 |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd/ MMC Engineering & Construction Sdn Bhd |
Onshore, Melaka |
4”, 6”, 8” x 11km inclusive PE Pipeline |
NGDS To Ayer Keroh FL1/DL1 |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd/ MMC Engineering & Construction Sdn Bhd |
Onshore, Melaka |
4”, 6”, 8” x 13km inclusive PE Pipeline |
Natural Gas Distribution System to Segambut Looping. |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing |
Gas Malaysia Sdn Bhd/ Giman Construction Sdn Bhd |
Onshore, Kuala Lumpur |
8” x 1.2km & 4" x 50m |
South Jambi “B” Shallow Gas Project |
Final Swabbing, Dust Removal, Air Drying, Nitrogen Packing and Gas-In Commissioning. |
ConocoPhillips Indonesia/ Tripatra Engineers & Constructors |
Onshore, Sumatera Indonesia |
10” x 60km Sales Gas, 4"x33km Condensate & 8"x12km Flowline |
Coflexip Pipeline Abandonment |
Deoiling Pigging of Coflexip Hose |
Talisman (M) Ltd/ Bumi Armada Navigation Sdn Bhd |
Offshore, Kelantan |
10” x 2km BK-A to FPSO |
Transportation And Installation Of Offshore Facilities Package 4 - Kinarut Pipeline |
Nitrogen Slugging and Gas-In Commissioning. |
Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd |
Offshore, Sabah |
16” x 40 km |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Transportation And Installation Of Offshore Facilities Package3 - Kinarut Pipeline |
Cleaning, Gauging, Hydrotesting, Dewatering and Air Drying. |
Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd |
Offshore, Sabah |
16” x 40 km |
Erb West Pipeline Project. |
Cleaning, Gauging, Hydrotesting, Dewatering, Intelligent Pigging, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd |
Offshore, Sabah |
6” x 3.5 km ERWB-ERWA |
Transportation And Installation Of Offshore Facilities Package4 ANGSI 2003 |
Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd |
Offshore, Terengganu |
6” x 4.1 km, 6"x11km, 2nos 10"x10km and 2nos 10" x 8km interfield pipelines |
Transportation And Installation Of Offshore Facilities Package-2 Resak Development Project |
Cleaning, Gauging, Hydrotesting, Dewatering and Vacuum Drying. |
Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd |
Offshore, Terengganu |
24” x 157km |
Transportation And Installation Of Offshore Facilities Year 2003-MLNG-3 Phase-2 |
Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test. |
Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd |
Offshore, Onshore, Sarawak |
24” x 42 km B1DRA-HCP, 30"x155km M1-E11RC & 32"x120km E11RC-MLNG3. |
Gas Transmission And Distribution Project- Grissik Sakra |
Vacuum Drying, Nitrogen Packing and Gas-In Commissioning. |
P.T Perusahaan Gas Negara, Indonesia |
Onshore, Indonesia /Singapore |
28” x 487 km |
Bekok C Platform Modification Project. |
Chemical Cleaning and Lube Oil Flushing. |
Petronas Carigali Sdn Bhd/ Shapadu Energy & Engineering Sdn Bhd |
Offshore, Terengganu |
Various sizes topside piping. |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Temana Pipeline Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Intelligent Pigging, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd |
Offshore, Sabah |
6” x 3.5 km |
Transportation And Installation Of Offshore Facilities Year 2002 - MLNG-3 Phase 1 |
Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test. |
Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd |
Offshore, Onshore, Sarawak |
32” x 120 km E11RC-MLNG3 & 28"x3.5km E11RB-E11RC |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Angsi Development 2001 Offshore Pipeline Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test, including Leak Finding. |
Petronas Carigali Sdn Bhd/ ExxonMobil Exploration & Production (M) Inc/ TL Offshore Sdn Bhd |
Offshore, Terengganu |
24” x 82 km ANDRA-SEA, 16"x46km ANDRA-TaD, 16"x48km PuA-DyA and 16", 12", 6"x7km ANDRA-ANDPB |
Kulim Lateral Pipeline Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Caliper Survey, Air Drying and Nitrogen Slugging Prior to Gas-In Commissioning. |
Petronas Gas Bhd/ Saga Dialog Sdn Bhd |
Onshore, kedah |
24” x 10 km |
Testing And Commissioning Of Slug catcher Gas Metering Stations, Spillover Associated Facilities for MLNG Pipeline Project |
Flushing, Hydrotesting, Air Drying, Nitrogen Packing, Reinstatement Test, Manual Tank Cleaning |
Petronas Carigali Sdn Bhd/ Ranhill Engineers And Constructors Sdn Bhd |
Onshore, Sarawak |
1"-52" various lengths piping and tanks. |
Ethane Gas Pipeline Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Caliper Survey, Air Drying and Nitrogen Packing. |
Petronas Gas Bhd/ Projass Engineering Sdn Bhd |
Onshore, Terengganu |
12” x 10 km & 4"x1km |
Cabot Offshore Terminal Pipeline Repair Project. |
Bi-directional Pig Plugging to Cut Out Dented Section and Hydrotesting. |
Syarikat Bena Pakat Sdn Bhd / Cabot Sdn Bhd |
Onshore, Offshore, Negeri Sembilan |
20” x 10 km & 10" x 10km PLEM-Plant |
Project Description |
Scope Of Work |
Owner / Client |
Location |
Length/Size |
Serdang Power Station |
Chemical Cleaning Equipment & Piping System to Turbine. |
Siemens (M) Bhd/ Tenaga Nasional Bhd |
Onshore, Selangor |
various sizes and length |
NGDS To PRSS, Bangi . |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/ K & K Sepadu Sdn Bhd |
Onshore, Selangor |
6” x 2 km |
EPCC Of Gas Pipeline Relocation Work at Jalan Kebun, Klang Selangor |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/ Pigas Engineering Sdn Bhd |
Onshore, Selangor |
8” x 4 km |
Angsi Development 2000 Offshore Pipeline Project |
Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test. |
Petronas Carigali Sdn Bhd/ ExxonMobil Exploration & Production (M) Inc/ TL Offshore Sdn Bhd |
Offshore, Terengganu |
32"x160km OSC-ANDRA & 32"x56km GuD-ANDRA |
Natural Gas Pipeline Relocation Work at South Klang Valley Expressway Kajang, Selangor |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/ Diversified Eng Sdn Bhd |
Onshore, Selangor |
8” x 2 km |
NGDS to Cyberjaya Development Area (Phase 1-Stage 1) Sepang . |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/ Right Gas Sdn Bhd |
Onshore, Selangor |
16” x 7 km |
Titan OSBL Pipeline & Terminal, Project . |
Cleaning, Hydrotesting, Dewatering, Caliper Survey, Air Drying & Nitrogen Packing |
Titan (M) Ltd/ Eastern Soldar Engineering Sdn Bhd |
Onshore, Johor |
12 x 1.5 km |
Semarang Pipeline Repair Project. |
Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. |
Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd |
Offshore, Sabah |
6” x 5 km |
NGDS Putrajaya Phase 1B, Stage 1, Precint 2 & 16 |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/ Pi-Gas Engineering Sdn Bhd |
Onshore, Selangor |
16” x 10 km |
NGDS to Parcel B,Putrajaya |
Cleaning, Pneumatic Testing, Nitrogen Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/ Gas Supply Sdn Bhd |
Onshore, Selangor |
NPS 6 x 4 km MDPE Piping |
NGDS to Bukit Raja FL11/DL11 (Power Cable) Bukit Raja Industrial Area Klang |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd, Diversified Engineering & Construction Sdn Bhd |
Onshore, Selangor |
8” x 5 km |
Gelugor Submarine Mainline Project . |
Cleaning, Hydrotesting, Dewatering, Air Drying, Nitrogen Packing and Gas-In Commissioning. |
Petronas Gas Bhd/ Pi-Gas Engineering Sdn Bhd |
Onshore, Penang |
24” x 10 km |
NGDS to Bangi Industrial Area (BFL 2) Bangi . |
Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. |
Gas Malaysia Sdn Bhd/Right Gas Sdn Bhd |
Onshore, Selangor |
16” x 5 km |
EPCC of the Gelugor TNB Meter Station Project. |
Air Flushing and Air Drying. |
Petronas Gas Bhd/ Ho Hup Engineering & Construction Bhd |
Onshore, Penang |
Metering Station and Associated Piping. |
|