Pipeline Services : Track Records
Project Description Scope Of Work Owner / Client Location Length/Size
Provision of Engineering, Procurement, Fabrication,Installation,Commissioning and Maintenance Work of Pig Trap System. Details Engineering Design,Procure,Supply,Fabricate,Install,Inspect,Test and Commissioning of Pig Trap System. PETRONAS Carigali Sdn Bhd. Sabah Various Size from 3" Pipeline to 42".
Provision of Auxuliary Pumping Services. Auxiliary Pumping Services for pipeline including Deoiling, Degassing, Intelligent Pigging, Dewatering,Nitrogen Purging, and assist recommissioning. Sabah Shell Petroleum Company Limited. Sabah 6"Pipeline,8"Pipeline ,10"Pipeline,12"Pipeline
Provision for Hook Up , Commissioning and Topside Major Maintenance Services for 2013 - 2018. Provision of manpower, equipment, and consumables for Dewatering. Drying and N2 Purge of 10" TA -A to TA -C Gas Injection Line at Tapis Platform. Kencana HL Sdn Bhd. Terengganu 10"x 4km TA-A to TA-C .
Project Description Scope Of Work Owner / Client Location Length/Size
Provision of testing and Pre-Comm Services of pipelines, spools and risers for SSB F14 and F29 Gas Field Development Project. Provision of Testing and Precomm services of Pipelines, Spools and Risers. EMEPMI / TL Offshore Sabah 20” x 30km F23RA / F14DRA,
12” x 21km F23RA / F29.
Provision of Pipeline Pre-Comm Services for Bulan-C Provision of manpower and Equipment for execution of Leak Testing, Nitrogen Purging and Preservation for Brownfiled Booster Compression Project at Hess Cakrawala Field. Work also include Host Tie in Work at Bulan-C site. Carigali HESS. Kelantan Topside piping activities
Provision of Pipeline Pre-Commissioning Services for Cendor Field Development Project. Pipeline Flooding, Hydro testing, Bulk Dewatering, Nitrogen Packing & De-oiling. Petrofac / Sapura Kencana. Terengganu 12” & 8” PL CDW-C to FPSO,
12” & 8” PL CDW-B to FPSO,
8” Flexible Riser FPSO riser FPSO to PLET West Desaru,
8” PL WSS to FPSO.
Provision of Pre-Commissioning Services for Pipeline 28” x 282km PLTS to TGAST Beach Valve EVA-NMB Gas Delivery System. Pipeline Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Vacuum Drying, Nitrogen Packing & Leak Test Spool. PETRONAS Carigali Sdn Bhd / GOM Resources Sdn bhd Terenganu 28” x 282km PLTS to TGAST
24” x 72km PLTS to MRP.
Project Description Scope Of Work Owner / Client Location Length/Size
Provision of Dewatering, Drying & Dry Preservation of 14” & 24 “ KBB PL for Kebabangan Northern Hub Dewatering, Drying, Nitrogen Purging, Leak Test. KPOC Sabah 14” x 123km KBB to SOGT (Oil)
24” x 123km KBB to SOGT (Gas)
Provision of Dewatering of Oil Export Pipeline for Gumusut Kakap Project. Dewatering Startup Commissioning. Sabah Shell Petroleum Sabah 18 x 202km FPS to SOGT
PCSB MSA Projects with SKO/SBO/PMO Deoiling, Degassing, Assist IP pumping, Dewatering, Assist Commissioning PCSB SKO/SBO/PMO Various sizes & length
Pipeline De-Commissioning, Dewatering & Assist Commissioning Cleaning, Gauging, Filling, Hydrotest, Assist Commissioning. PCSB / Anticorrosion Protective System(M)S/B Terengganu 8" x 1.2KM SMP-A to SMJT-E
Provision Of Testing, Pre-Commissioning & Commissioning Assistance Services Of Pipeline , Spools & Riser For Moc 2013 Project Pigging, Cleaning, Gauging, Filling, Hydrotest & Nitrogen Packing. MOC / Sapura Kencana Sarawak 18" x 17KM SAP-A to S.PLEM, 10" x 40KM PRPA to SAPA, 16" x 15.3KM SAPA to SEPA, 16" x 8KM BESA to SNPA.
Pipeline Pre-Commissioning Flooding, Cleaning, Gauging, Filling, Hydrotesting, Bulk Dewatering, Final Dewatering, Air Drying, Nitrogen Purging & Packing. HESS / Global Offshore Terengganu 16" x 53KM FPSO To Kamelia To Lawit-A Platform
Kinabalu field pipeline project (2nd Phase) Dewatering, Vacuum & Nitrogen Packing PCSB / Global Offshore Sabah 24" x 140km KNPG-B / SOGT
Kinabalu field pipeline project Flooding, Cleaning, Gauging, Filling, Hydrotesting, (Optional: Dewatering, Air Drying, N2 packing) PCSB / Global Offshore Sabah 24" x 140km KNPG-B / SOGT, 18" x 2km KNJT-C / KNPG-B
EMEPMI Telok / Tapis Pipeline Development Project Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying , N2 packing EMEPMI / TL Offshore Terengganu 16" x 5.6km Ta-A / Ta-Q (FWS), 14" x 5.9km Ta-E / Ta-Q (FWS), 12" x 5.6km Ta-A / Ta-Q (GI), 10" x 3.6km Ta-P / Ta-Q (crude), 10" x 4.0km Ta-C / Ta-A (GI), 18" x 1.6km Gu-E tie in / Ta-Q (Gas), 18" x 1.6km Gu-E tie in / Ta-Q (NAG), 18" x 9.3km Ta-C / Ta-Q (FWS), 28" x 26.5km Te-A / Gu-E (FWS)
LEKAS Cleaning, Pneumatic strength test, Inerting, Leaktesting, Flange management. Scopes by others (Cooldown - PNS, Barge - Subsea, Propane transfer - Subsea) Petronas Gas Berhad / IGS / Subsea Melaka Cryogenic piping systems
Project Description Scope Of Work Owner / Client Location Length/Size
Provision of DPDSV for Kebabangan field pipeline project Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering (OPTIONAL:Provision of DPDSV) KPOC / Global Offshore Sabah 24" x 125km KBB / SOGT, 14" x 125km KBB / SOGT
SKO Pipeline Replacement Project Cleaning, Gauging, Filling, Hydrotesting, Assist IP & Assist ommissioning PCSB / TL Offshore Sarawak 18" x 32km TEP-B/BCOT, 12" x 1.2km BADP-G/BAP-AA, 12" x 15km BNP-A/BADB-B
Cendor / West Desaru Field Development Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying, Vacuum Drying, N2 packing Petrofac / TL Offshore Terengganu 8" x 13.7km WD/PLET, 8" x 1.6km CDP-A/CDW-B (gas), 8" x 1.6km CDP-A/CDW-B (WI), 8" x 3.3km CDP-A/CDW-B (WI), 8" x 3.3km CDP-A/CDW-B (gas),
PMO Pipeline Replacement Project Flooding, Cleaning, Gauging, Filling, Hydrotesting, Assist IP run PCSB PMO / Global Offshore Terengganu PMO PL73: 6’’x 7km BEKOK-A – TIONG-A
New field development? Flooding, Cleaning, Gauging, Filling, Hydrotesting, Bulk Dewatering, assist commissioning AMC / TL Offshore IBD / IEV Group Terengganu 10" X 14 km D35R-A to D21JT-A
KANOWIT Subsea System Development Project Leak Testing, Assist run Gauging & Caliper, MFL, Dewatering, Nitrogen Packing and Production Pigging (optional) PCSB / Subsea 7 Sarawak 24 x 4.71 KM SS PLET / KAKG-A???????? 2 x 12” x 0.154 KM SS PLET / KASS-2 & KASS-1
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) De Oiling / De Gassing, HT, Dewatering , N2 Pack PCSB-SKO Offshore, Sarawak PL191 8" x 0.842KM TKJT-C to TKP-B
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) De Oiling / De Gassing, HT, Dewatering , N2 Pack PCSB-SKO Offshore, Sarawak PL195 6" x 0.317KM TKJT-D to TKJT-C
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) Provision of HT for Barred Tee Spool? for PMOPL20: 6" TiA-TiB at Tiong B platform upon completion of composite material strengthering repair PCSB PMO Offshore, Terengganu (WOR 2012/13) PMOPL20: 6" x km TiA-TiB
EMEPMI Brownfield - Gu-A Gas Lift Riser Replacement N2 purging prior cutting & re-purging after repair EMEPMI / Ranhill Worley Offshore, Terengganu 6" x 4km Gu-A / Gu-B
EMEPMI Integrity Check - Pipeline Leak Leak testing after repair works EMEPMI Offshore, Terengganu 12" x 10km Tap-E / Tap-A
Bumi-B & Cakerawala-D Pipeline Installation (CH2012) Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying (optional), Vacuum Drying (optional), N2 packing (optional) Carigali HESS / TL Offshore IBD Offshore, Terengganu 24” X 6.4 KM BM-B / BM-A WET GAS CRA 10” X 3.9 KM CK-D / CK-C FWS GAS CRA
Murphy 2012-2014 Pipeline Program Cleaning, Gauging, Filling, Hydrotesting, Dewatering (optional) Murphy Oil Corporation / TL Offshore Sdn Bhd Offshore, Sarawak SKPL29: 8"x13.1km PTSA / WPPA, SKPL27: 8"x8.78km SNPA / Subsea Y-Piece, SKPL28: 20"x8.51km SNPA / Subsea Y-Piece
Berantai Field Development Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, MEG Swabbing, N2 packing Petrofac / TLO Offshore, Terengganu Rigid line: 12" x 30KM Andr-A / PLET
Berantai Field Development Cleaning, gauging, filling, hydrotesting Petrofac / TLO Offshore, Terengganu 8" x 1.3km BWHP / FPSO (crude oil)- flexible line
Berantai Field Development Cleaning, gauging, filling, hydrotesting, optional : Dewatering, Vacuum Drying & N2 packing Petrofac / TLO Offshore, Terengganu 12" x 1.3km BWHP / FPSO (LP gas) - flexible line
Berantai Field Development Cleaning, gauging, filling, hydrotesting, optional : Dewatering, Vacuum Drying & N2 packing Petrofac / TLO Offshore, Terengganu 12" x 1.3km BWHP / FPSO (HP gas) - flexible line
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) Provision of decommissioning activities for PMOPL 18: in assisting SDV870 @BeB and SDV845 @ BeA PCSB PMO Offshore, Terengganu (WOR 2012/11) PMOPL18: 6" x4.6km BeB-BeA
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) De Oiling / De Gassing, HT, Dewatering , N2 Pack? PCSB-SKO Offshore, Sarawak PL201 6" x 1.281KM TKJT-F to TKP-A
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) De Oiling / De Gassing, HT, Dewatering , N2 Pack? PCSB-SKO Offshore, Sarawak PL15 6" x 0.374KM BA-18 to BADP-C
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) De Oiling / De Gassing PCSB-SKO Offshore, Sarawak PL13 8" x 2.446km BADP-C to BAP-A
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) Decommissioning & Assist IP PCSB PMO Offshore, Terengganu (WOR 2011/15) PMOPL37: 14" x 1.8km MLJTA-FPSO
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) Decommissioning & Assist IP PCSB PMO Offshore, Terengganu (WOR 2012/04) PMOPL29: 12" x2.0km TiA-TiB
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) Decommissioning & Assist IP PCSB PMO Offshore, Terengganu (WOR 2011/22) PMOPL64: 8" x 2km FSO-ABU-A
PCSB PMO Pipeline Integrity Inspection Programme. (MSA) Decommissioning & Assist IP PCSB PMO Offshore, Terengganu (WOR 2011/07) PMOPL65: 6" x 2km FSO-ABU
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Deoiling, IP Assist, Assist Dewater PCSB SBO Offshore, Sabah PL121:8" x 1.2km SMJT-E/SMP-A,? PL122:6" x 1.2km SMJT-E/SMP-A, PL113:6" x 1.0 km SMJT-D/SMJT-C, PL114:6" x 0.7 km SMJT-F/SMJT-C, PL116:6" x 0.6 km SMJT-D/SMJT-F, PL117:6" x 0.6 km SMJT-F/SMJT-D, PL118:6" x 0.6 km SMJT-F/SMJT-D, PL127:6" x 0.64 km SMJT-C/SMJT-D, PL115:6" x 1 km SMJT-D/SMJT-C crude oil, PL111:6" x 1.0 km SMJT-C/SMJT-D , PL276:8" x 3.0 km EWDP-B/EWP-A
Kebabangan field pipeline project Partial dewatering of shore approach pipeline prior to continue laying KPOC / GOM Offshore, Sabah 24" x 800m & 14" x 800m Shore approach pipeline SOGT to offshore
PL107 Beach Valve Replacement (MSA) Degassing, Valve Dismantle/Installation, Assist Dewatering PCSB SBO Offshore, Sabah PL 107 14’’ x 46.0 KM Gas Trunk Line SMG-A to LGAST
Intergrity testing of Manuli flexible line of Cendor MOPU Hydrotesting Petrofac / Blackgold Offshore, Terengganu ?6" x 960m from Cendor MOPU to FSO
PCSB Resak Pipeline Re-cleaning Drilling mud removal, Assist IP run, Topside leaktesting and Assist Commissioning PCSB / GOM Offshore, Terengganu 24" x 54km TBDR-A / RDP-A
Cilipadi Gas Field Development Project Flooding, Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying, Vacuum Drying, N2 packing Sarawak Shell Berhad / TL Offshore Offshore, Sarawak 16" x 30km Wet Gas PL CPDR-A / F23R-A, 24" x 26km Wet gas PL F28DR-A / F6K-A
PCSB Transportation and Installation of Offshore Facilities Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Onshore, Terengganu 24" x 166km ANDRA/TCOT
Decommissioning & Commissioning for SDV840 change-out (MSA) Deoiling & Assist commissioning PCSB-PMO Offshore, Terengganu (WOR 2011/21) PMOPL28: 12" x 28.8km TiA-TaP
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Assist dewatering / commissioning PCSB-SKO Offshore, Sarawak WO#18: PL-365, 12" x 1.3 km BADP-G/BAP-AA
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Assist IP pumping PCSB-SKO Offshore, Sarawak WO#04: PL329 (24" x 155km HIP/B11DR-A), PL340 (10" x 1.85km WLDP-C/WLP-A)
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoiling PCSB-SKO Offshore, Sarawak PL89 (6" x 1.0km FBJ-29/FBPP-1);PL90 (6" x 1.0km FBJ-29/FBPP-1)
PCSB PMO Pipeline Integrity inspection (WOR 2011/01) (MSA)? Doiling, Hydrotest, Assist IP and Assist Comm PCSB-PMO Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd (WOR 2011/01) PMOPL20: 6" x 1.7km TiA-TiB
N2 Inerting at Kumang (MSA) N2 Pallet Supply (rental) PCSB-SKO Offshore, Sarawak Kumang topside
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) IP Assist (No auxiliary pumping) PCSB-SKO Offshore, Sarawak PL266, 18" x 125km BNG-B / E11R-A
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoiling, Dewater, Drying, N2 Purge PCSB-SKO Offshore, Sarawak PL74, 8" x 7.3km BEP-A/BOP-A
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoiling (decomm) PCSB-SKO Offshore, Sarawak PL64, 12" x 17.9km BEP-A/BKP-A
SSB pipeline intergrity inspection InVista IP Run (Auxiliary Pumping)?? Sarawak Shell Berhad Offshore, Sarawak 8" x 453m SJJT-A/SJP-A
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoil, OP, assist dewatering PCSB-SKO Offshore, Sarawak PL-192 (10" x 0.84 km TKJT-C/TKP-B Crude Oil Pipeline)
Project Description Scope Of Work Owner / Client Location Length/Size
Energency flushing of TCOT effluent lines (MSA) Back-flushing of effluent lines PCSB-PMO Onshore, Terengganu 10" x 1km x 2 pipelines
SBM 5 Centre Well Crude Oil Draining (emergency) - (MSA) Draining of crude oil spills from SBM centre well PCSB-SKO Offshore, Sarawak SBM system
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoiling, Assist IP, Assist Dewater PCSB-SKO Offshore, Sarawak a. PL273, 6" x 9.0 km BYDP-C/BYP-A FL Pipeline
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Assist IP, Assist Dewater PCSB-SKO Offshore, Sarawak b. PL274, 6" x 9.0 km BYDP-C/BYP-A FL Pipeline
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoiling, Hydrotest, Assist Dewater PCSB-SKO Offshore, Sarawak PL341 (16" x 31.4 km BAP-AA/MCOT Crude Oil Pipeline)
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Degassing, IP Assist, Assist Dewatering PCSB-SBO Offshore, Sarawak PL281, 10" x 17.3km SUPG-B to SMG-A (Sumandak)
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Degassing, Assist IP, Drying, N2 Pack PCSB-SKO Offshore, Sarawak PL-352 (6" x 0.6 km FBJT-3/FBPP-1 Gas Pipeline)
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Deoil, Assist IP, Assist dewater PCSB-SKO Offshore, Sarawak PL 344 (16’’ X 4.1 km BAJT-H / BAKP-B CRUDE OIL PIPELINE)
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) IP, Assist Assist Dewater PCSB-SBO Onshore, Labuan a. PLxxx (6" x 700m GRT1/GRT2 Condensate Pipeline)
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Degas, IP, Dewater, Drying, N2 pack PCSB-SBO Onshore, Labuan b. PLxxx (8" x 700m GRT1/GRT2 Fuel Gas Pipeline)
PCSB SKO Pipeline Integrity Inspection Programme. (MSA) Degas, Gauging, HT, IP, Dewatering, Drying, N2 Pack PCSB-SKO Offshore, Sarawak PL-279 (10" x 24.7 km BOK-A/BNG-B Gas Pipeline)
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Degassing, Assist IP, Assist Dewater PCSB-SBO Offshore, Sabah a. PL119 (6" x 1.2km SMP-A/SMJT-E Gaslift Pipeline)
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Deoiling, Assist IP, Assist Dewater PCSB-SBO Offshore, Sabah b. PL121 (8" x 1.2km SMP-A/SMJT-E Oil Pipeline)
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Deoiling, Assist IP, Assist Dewater PCSB-SBO Offshore, Sabah c. PL122 (6" x 1.2km SMP-A/SMJT-E Oil Pipeline)
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Degassing, Assist IP, Assist Dewater PCSB-SBO Offshore, Sabah PL128, 6" x 0.64km SMJT-E/SMJT-G Gaslift Pipeline
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Deoiling, Assist IP, Assist Dewater PCSB-SBO Offshore, Sabah PL139 (rerun), 8" x 4.5km SMP-B/SMR-A Gas Pipeline
PCSB SBO Pipeline Integrity Inspection Programme. (MSA) Degassing, Assist IP, Assist Dewater PCSB-SBO Offshore, Sabah PL120 (6" x 1.2km SMP-A/SMJT-E Gas HP Pipeline)
SKO Baram Topside Modification Deoiling, Hydrotesting, Optional (Dewatering, reinstatement testing, Assist Commissioning) PCSB / Carimin Offshore, Sarawak PL6 6"x2.4km, PL7 6" x 0.4km, PL14 8" x 2.5km, PL17 6" x 1.9km
Newfiled Pipeline Cleaning, Gauging, Filling & Hydrotesting Newfield / Global Offshore Offshore, Terengganu 10" x 25 km Ting-A / Ti-A
SKO Bokor Topside Modification Deoiling, Hydrotesting PCSB / Petra Resources Offshore, Sarawak PL75 6" x 0.6km
PC4 / B11 Pipeline Re-precommissioning and IP run H2S removal, Mud removal, Dewatering, Drying, N2 packing PCSB SKO / Global Offshore Offshore, Sarawak 12" x 23 km PC4 / B11
Puteri Heated Pipe in Pipe System Cleaning, Gauging, Filling, Hydrotesting, and spool testing Newfield / TL Offshore Offshore, Terengganu 8" x 13km Puteri - PLEM 12" x 13km Puteri - PLEM 4" x 13km Puteri-PLEM
Kumang Cluster Pipeline Project Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying, Vacuum Drying, Assist Caliper Pigging Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 18"x21km KUJTA/KAKGA, 28"x57km F9JTA/KAKGA & 28"x190km MLNG SC2/KAKGA
PCPP Transportation and Installation of Offshore Facilities Flooding, Cleaning, Gauging, Filling, Hydrotesting and Assist Commissioning Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 10"x6km DANA/PLEM
East Piatu Development Project Cleaning, Gauging, Filling, Hydrotesting Newfield / TL Offshore Offshore, Terengganu 2 nos PL 8" x 15km Gas & Crude East Piatu CPP / Larut-A
Bekok pipeline dewatering Dewatering, Drying & N2 packing PCSB PMO Offshore, Terengganu 8" x 5km Be-A / Be-C
PCSB PMO Pipeline sectional replacement Cleaning, Gauging, Filling, Hydrotesting, and spool testing of new pipeline ; decommissioning of old pipeline & assist commissioning PCSB PMO Offshore, Terengganu 12" FWS x 60 km Pu-A / Ta-A
Year 2010 Integrated Transportation and Installation of Offshore Facilities Cleaning, Gauging, Filling, Hydrotesting, Scope temp. cancelled : Dewatering, Air Drying, Vacuum Drying and Nitrogen Packing Petronas Carigali Sdn Bhd / Global Offshore Malaysia Sdn Bhd Offshore, Terengganu 24"x52km, 24"x28km and 1no 16"x18km
PCSB SKO Pipeline Integrity Inspection Programme Deoiling, Degassing, Assist Intelligent Pigging, Dewatering, Drying and Nitrogen Packing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL344: 16"x3.8km BAJTH/BAKPB
Petronas Dagangan KLIA Aviation Fuel Rejuvenation Cleaning Petronas Dagangan Berhad / Total Maintenance Resources Sdn Bhd KLIA, Sepang 24"x300m
Project Description Scope Of Work Owner / Client Location Length/Size
PCSB SBO Pipeline Integrity Inspection Programme Auxiliary Pumping to Assist Intelligent Pigging Petronas Carigali Sdn Bhd - SBO Offshore, Sabah PL143: 12"x2.3km
Transportation and Installation 2010 for SSB/SSPC - St Joseph Cleaning, Gauging, Filling and Hydrotesting Sarawak Shell Berhad / TL Offshore Sdn Bhd Offshore, sabah 2nos 8"x2.2km
PCSB SKO Pipeline Integrity Inspection Programme Deoiling, Degassing, Assist Intelligent Pigging, Dewatering, Drying and Nitrogen Packing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL330: 14"x13.7km FBPP1/BAPAA, PL331: 10"x13.9km FBPP1/BAPAA, PL338: 8"x3.7km D35JTC/D35RA
PCSB SBO Pipeline Integrity Inspection Programme Auxiliary Pumping to Assist Intelligent Pigging Petronas Carigali Sdn Bhd - SBO Offshore, Sabah PL108, PL109, PL110 & PL129: 8"x1.8km SMJTC/SMPA
SKO Pipeline Replacement (new pipeline) Cleaning, Gauging, Filling, Hydrotesting PCSB SKO / TL Offshore Sdn Bhd Offshore, Sarawak PL 353 : 12" x 22km / PL 363 : 16" x 1.2km
SKO Pipeline Replacement PL357 - PL355 Deoiling, Cleaning,Gauging, Filling, Hydrotesting, Assist Intelligent Pigging, Dewatering, Drying and Nitrogen Packing Petronas Carigali Sdn Bhd - SKO / TL Offshore Sdn Bhd Offshore, Sarawak PL357: 18"x18km BER-A / BNG-B
Pipeline Cleaning and Deoiling (Phase 1) Bulk Oil Recovery and Deoiling ExxonMobil Exploration and Production Malaysia Incorporated Offshore, Terengganu 18"x2.5km SmkA/SmkB, 16"x 4.5km SeD/SeC, 16"x3.6km SeC/SeA & 16"x 2.8km SeC/SeA.
PCSB PMO Angsi Reflooding & Preservation Cleaning, Gauging, Filling, Hydrotesting & Dewatering cum Assist Commissioning Petronas Carigali Sdn Bhd / Global Offshore Malaysia Sdn Bhd Offshore, Terengganu Various sizes topside piping
SKO Pipeline Replacement (new pipeline) Topside leak testing (additional work) Petronas Carigali Sdn Bhd - SKO / Petra Energy Offshore, Sarawak PL 300 : 10" x 22km / PL 299 : 10" x 22km & PL 70 : 12" x 1.2km
SKO Pipeline Replacement (Old pipeline) Deoiling, Flushing PCSB SKO / TL Offshore Sdn Bhd Offshore, Sarawak PL330: 14"x13.7km FBPP1/BAPAA, PL331: 10"x13.9km FBPP1/BAPAA
Talisman Pipeline Riser Replacement Flooding, Cleaning, Gauging, Filling, Hydrotesting, assist dewatering cum N2 drying Talisman-Energy Malaysia Ltd / Offshore works (OCE) Offshore, Terengganu 4" x 3.5 km BR-B / BS-A
Year 2010 Integrated Transportation and Installation of Offshore Facilities Flooding, Cleaning, Gauging, Filling & Hydrotesting ExxonMobil Exploration and Production Malaysia Incorporated / TL Offshore Sdn Bhd Offshore, Terengganu 12"x2.5km SmkA/SmkB, 12"x 4.5km SeD/SeC, 12"x3.6km SeC/SeA & 12"x 2.8km SeC/SeA.
PCSB PMO Bekok Pipeline Replacement Cleaning, Gauging, Filling, Hydrotesting & Dewatering cum Assist Commissioning Petronas Carigali Sdn Bhd / Global Offshore Malaysia Sdn Bhd Offhore, Terengganu 6"x5km BeA-BeB
EMEPMI Riser Repair Works N2 Purging to reduce LEL & O2 level EMEPMI Offhore, Terengganu 8" x 8km Sm-A / Sm-B
PCSB PMO Pipeline Repair Deoiling Flushing, Assirt Intelligent Pigging and Mothballing Petronas Carigali Sdn Bhd - PMO Offhore, Terengganu 14"x14km ADJTA/FPSO
Newfield Pipeline Leak Emergency Gel Pumping, Deoiling and Hydrotesting Newfield Peninsula Corporation Offhore, Terengganu 10"x27km BEL-A/TING-A
Year 2010 Integrated Transportation and Installation of Offshore Facilities Dewatering and Nitrogen Packing. Murphy Oil Corporation Offshore, Sarawak 20"x39.7km SEPA/GORA
West Belumut Development Project Cleaning, Gauging, Filling & Hydrotesting Newfield / TL Offshore Sdn Bhd Offshore, Terengganu 10" & 4" x 10km WBWP/BelA
Year 2010 Integrated Transportation and Installation of Offshore Facilities Cleaning, Gauging, Filling & Hydrotesting Murphy Oil Corporation / TL Offshore Sdn Bhd Offshore, Sarawak 8"x19.5km SEPA/PLEM, 20"x39.7km SEPA/GORA, 8"x27.8km GORA/SEPA & 20"x27.8km MEPA/GORS
Tangga Barat Critical System Leak Testing Nitrogen Leak Testing Kenchana HL Sdn Bhd Onshore, Perak 6 Test Packages 100 - 400 barg Test Pressure
PCPP Transportation and Installation of Offshore Facilities Flooding, Cleaning, Gauging, Filling, Hydrotesting and Assist Commissioning Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 16"x25km D35 / D30 MOPU
PCSB SKO Pipeline Maintenance Programme Desanding, Deoiling, Assist Intelligent Pigging and Hydrotesting Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL344: 16"x3.8km BAJTH/BAKPB, PL192: 10"x0.85km TKJTC/TKPB
PCSB SBO Pipeline Deoiling Deoiling and Degassing. Petronas Carigali Sdn Bhd - SBO Offshore, Sabah PL111: 6"x1km SMJTC/SMJTD, PL113: 6"x1km SMJTC/SMJTC, PL125: 8"x0.7km SMJTF/SMJTC & PL139: 8"x4.5km SMPB/SMRA
PCSB SBO Pipeline Maintenance Programme Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SBO Offshore, Sabah PL186: 6"x3.3km TBGB/TBGA & PL275: 8"x3km EWDPA/EWPA
PCSB SKO Pipeline Maintenance Programme Materials and Personnel to support Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL47: 12"x21km BNPA/BKPA, PL342: 10"x2km BAPB/BAPAA, PL357: 16"x12km BKPA/WLPA, PL293: 16"x51km D35RA/BYRA & PL60: 18"x55km BYPA/TEPB
Nitrogen Purging for Pipeline Modification Nitrogen Purging Petronas Carigali Sdn Bhd - SBO Onshore, Sabah 6"x1km
Non-Routine Pigging of SBGAST-Powertron Gas Pipeline Operational Pigging Cleaning & Gauging Petronas Carigali Sdn Bhd - SBO Onshore, Sabah 16"x10km
Kikeh Deepwater Pipeline/Riser Development Project Flushing and Leaktesting of flexible riser Murphy oil Company / Technip Subsea 7 Pte Ltd Onshore, Sabah 12"x1km PLEM / FPSO
Project Description Scope Of Work Owner / Client Location Length/Size
EPCC Bintulu Upgrading of Bunkering Facilities Cleaning, Gauging, Filling & Hydrotesting Petronas Dagangan Berhad Onshore, Sarawak 16" x 4km & 14"x1km
Semarang Pipelines replacement project Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sabah 2nos 6"x1km SMJTC/SMJTD, 8"x1km SMJTC/SMJTF & 8"x4.5km SMPA/SMRA
Fairley Baram Pipeline Dewatering Dewatering, Drying & Nitrogen Packing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak 6"x0.5km FBJT3/FBPP1
North Lukut subsea valve replacement Project Degassing Petronas Carigali Sdn Bhd - PMO Offshore, Terengganu 8"x22km NLDPA/FPSO
Guntong & Irong Barat Pipeline Cleaning Project Deoiling ExxonMobil Exploration & Production Malaysia Inc. Offshore, Terengganu 12"x6km GuB/GuD & 6"x3.5km IBA/IBB
SK309/3101 Phase 1 Gas Development Project Dewatering, Air Drying & Nitrogen Packing Murphy Oil Company Offshore, Sarawak 20"x4km GOPB/GORA, 2nos 24"x36km GORA/BORF & 20"x1km MDP/MLNG2
SK309/3101 Phase 1 Gas Development Project Cleaning, Gauging, Filling & Hydrotesting Murphy Oil Company / Swiber Marine Sdn Bhd Offshore, Sarawak 6"x2km WPPB/WPPA, 6"x4km GOPB/GORA, 8"x22km GORA/PLEM, 20"x4km GOPB/GORA, 2nos 24"x36km GORA/BORF, 8"x1km PLET/PLEM & 20"x1km MDP/MLNG2
PCSB SKO Pipeline Replacement Project Cleaning, Gauging, Filling & Hydrotesting Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak PL357: 16"x12km WLPA/BKPA
PL11 Deoiling and Leak Testing Deoiling and Leak Testing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL11: 12"x10km BADPA/BAKB
Bunga Orkid Development Project Flooding & hydrotesting of flexible risers Talisman Malaysia Limited / Franklin Offshore Pte Ltd Offshore, Terengganu 4" & 10"x2.5km BOD/FSO
Dulang Pipeline Replacement Project Deoiling, Cleaning, Gauging, Filling & Hydrotesting Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Terengganu 6"x7km DLB/DLD
Auxilliary Pumping to Assist Intelligent Pigging Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL332: 8"x2km BAJTH/BADPA
Project Description Scope Of Work Owner / Client Location Length/Size
Auxilliary Pumping to Assist Intelligent Pigging Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL299 & PL300: 10"x1.2km BADPE/BODPA
PCSB SKO Pipeline Replacement Project Deoiling Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak PL333: 16"x12km WLPA/BKPA
Transportation and Installation of Offshore Facilities for PCSB 2008 Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Terengganu 6",10",12"x11km ANDRA/ANDPD
Transportation and Installation of Offshore Facilities for PCSB 2008 Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 10"x52km D35RA/J4DRA, 10"x0.7km BOPB/BODPA, 12"x22km PC4DRA/B11DRA, 10"x21km BEPA/BKPA, 12"x1km BODPB/BODPC, 10x0.7km BOPB/BODPC
Tukau Pipeline Leak Flushing and Leak testing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak Tukau Pipeline
Descaling and Intelligent pigging Support for PL148 Auxiliary pumping to assist descaling and intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL148: 8" x 18km SIMPA/TKDPA
Transportation and Installation of Offshore Facilities for SSB 2008 Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing Sarawak Shell Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 12"x5.2km F13/F13W & 14"x6.7km E11KA/SCDRA
PL076 Flooding and Hydrotesting Flooding and Leak Testing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL076: 10"x0.7km BODPC/BOPA
Auxilliary Pumping to Assist Intelligent Pigging Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL076: 10"x0.7km BODPC/BOPA
Transportation and Installation of Offshore Facilities for PCSB 2008 Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying & Nitrogen Packing Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sabah 12"&16"x3.5km SUDPA/SUPGB, 4"x4.8km SUPGB/SUJTC, 10"x17.5km SUPGB/SMGA
Semarang Field Development Project Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sabah 4nos 8" x 2km SMJT-C to SMP-A
Pl233 Pipeline abandonment Deoiling and riser removal Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak 18"x12km WLPA/MCOT
Deoiling of PL226 Deoiling Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL226:12"x13km WLDPC/MCOT
Descaling and Intelligent pigging Support for PL215 Auxiliary pumping to assist descaling and intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL215: 10" x 1.1km TKPA/TKPB
Guntong Pipeline Rejuvenation Project Deoiling ExxonMobil Exploration & Production Malaysia Inc. Offshore, Terengganu 8"x3.5km GuC-GuA
Auxilliary Pumping to Assist Intelligent Pigging Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL077: 12"x21km D18MPA/BYRA
Intelligent pigging Support for PL292 Materials and Personnel to support Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL292: 12"8km D35RA/BYRA
Puteri-Penara-Bunga Kertas Expansion Project Deoiling and Degassing. Petronas Carigali Sdn Bhd Offshore, Terengganu 12" Crude & 8" Gas lift x 7km Penara to Bunga Kertas FPSO
Flushing and Leak Testing PL13 & PL14 Flushing and Leak testing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL13 & PL14: 8"x2.5km BODPC/BAPPA
Bunga Orkid Development Project Cleaning, Gauging, Filling, Hydrotesting and Dewatering. Talisman Malaysia Limited / Swiber Marine Pte Ltd Offshore, Terengganu 24"x54km BrE/BoD, 18"x10km BoD/BoA, few nos 4", 8", 10", 12" & 14" of 5km
PL233 Pipeline Emergency Spool Replacement Phase 2 Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL233: 18"x12km WLPA/MCOT
Pulai-Tapis Rejuvenation Project Deoiling Petronas Carigali Sdn Bhd - PMO Offshore, Terengganu 12"x60km PuA/TapA
Puteri-Penara-Bunga Kertas Expansion Project Cleaning, Gauging, Filling, Hydrotesting and Dewatering. Petronas Carigali Sdn Bhd / Kenchana HL Sdn Bhd Offshore, Terengganu 8" Crude & 8" Gas lift x 12km Puteri to Bunga Kertas FPSO
Auxilliary Pumping to Assist Intelligent Pigging Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL332: 8" x 2km BAJTD/BAPAA
Intelligent pigging Support for PL026 Materials and Personnel to support Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL026: 8"x1.8km BN14/BNPA
Guntong Pipeline Rejuvenation Project Leak Testing ExxonMobil Exploration & Production Malaysia Inc. Offshore, Terengganu 8"x3.5km GuC-GuA
Intelligent pigging Support for PL339 Materials and Personnel to support Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL339: 18"x12km WLPA/MCOT
Semarang Pipelines replacement project Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SBO Offshore, Sabah 3 nos 8"x 3km pipelines
Betty 4 Revisit Project Cleaning, Gauging, Filling, Hydrotesting, Dewatering and Nitrogen Packing Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 18" x 18km BEP-A to BNG-A
Project Description Scope Of Work Owner / Client Location Length/Size
Transportation and Installation of Offshore Facilities for EMEPMI Cleaning, Gauging, Filling, Hydrotesting, Dewatering and Nitrogen Packing ExxonMobil Exploration & Production Malaysia Incorporated / TL Offshore Sdn Bhd Offshore, Terengganu 18" x 20km Gu-E to Tap-F and 16" x 6km CRA Jer-A to Jer-B
EMEPMI Emergency Pipeline Leak Repair Hydrotesting after repair ExxonMobil Exploration & Production Malaysia Incorporated Offshore, Terengganu 12" & 8" x 3.5km Gu-A to Gu-C
PL233 Pipeline Emergency Spool Replacement Phase 1 Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL233: 18"x12km WLPA/MCOT
Intelligent pigging Support for PL070 Materials, Instrument and Personnel to support Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL070: 12"x22km BEPA/BKPA
LGAST Pipeline Project Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd / PBJV Group Sdn Bhd Onshore, Labuan 12" x 10km LGAST-PML
LGAST Pipeline Project Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd / PBJV Group Sdn Bhd Onshore, Labuan 8" x 1km Fuel Gas & 6" x 1km Condensate Pipelines in PML
Shell's 2007-2009 Transportation and Installation of Offshore Facilities Dewatering and Nitrogen Packing for CRA pipelines in 2007. Sabah Shell Petroleum Corporation / McDermott Offshore, Sarawak / Sabah 20" x 6km, 28" x 9km, 10" x 12km & 10" x 5km F13 and M3 Fields
Intelligent pigging Support for PL342 Materials, Instrument and Personnel to support Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL342: 10" BAPB/BAPAA
Angsi Phase IV Pipelines Installation Programme 2007 Flooding and Preservation Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Terengganu 10" & 8" x 5km ANDP-B to ANDP-D
PCSB SKO Pipeline Maintenance Programme Auxiliary Pumping to Assist Intelligent Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL323: 10" & PL297: 8" x 2km BAJT-F to BAP-AA
Auxilliary Pumping to Assist Intelligent Pigging Auxiliary pumping to assist intelligent pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL297: 8" & PL323: 10" x 2km BAJTF/BAPAA
St Joseph Pipeline Replacement Project Bulk Oil Recovery, Deoiling and Cleaning Sabah Shell Petroleum Corporation / Petra Resources Sdn Bhd Onshore, Sabah 20" x 19km SFPA-SJPA
Betty 4 Revisit Project Pre-Flooding for Pipeline & Risers Subsea Tie-Ins Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 18" x 18km BEP-A to BNG-A
Semarang Pipeline Emergency Repair Deoiling, Filling and Leak Testing Petronas Carigali Sdn Bhd Offshore, Sabah PL-113: 6" x 1km
Transportation and Installation of Offshore Facilities for EMEPMI Riser Spools Leak Testing and Flooding for Subsea Tie-Ins ExxonMobil Exploration & Production Malaysia Incorporated / TL Offshore Sdn Bhd Offshore, Terengganu 18" x 20km Gu-E to Tap-F and 16" x 6km CRA Jer-A to Jer-B
Betty 4 Revisit Project Flooding and Preservation Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 18" x 18km BEP-A to BNG-A
Temana Pipeline Emergency Repair Leak Testing, Leak Finding, Plidco Clamp Installation and Hydrotesting Petronas Carigali Sdn Bhd Offshore, Sarawak 10" x 30km
Dulang Field - FPSO Pipeline Change-Out Deoiling and Nitrogen Purging Petronas Carigali Sdn Bhd Offshore, Terengganu 10" x 3km DL-B to FPSO
PL233 Pipeline Emergency Leak Containment and Sectional Repair Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL233: 18"x12km WLPA/MCOT
PCSB SKO Pipeline Maintenance Programme Baronia Emergency Pipeline Repair and Leak Testing Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL047: 12" x 21km BNP-A to BKP-A
PCSB PMO Pipeline Maintenance Programme Deoiling, Dewatering and Commissioning Petronas Carigali Sdn Bhd - PMO Offshore, Terengganu 10" x 7km DL-B to FPSO
Intelligent Pigging for Baronia Pipeline. Scaffolding Deck Extension for launching and receiving of Intelligent Pigging. Petronas Carigali Sdn Bhd / H.Rozen (M) Sdn Bhd Offshore, Sarawak 8" x 12km BNPA-BN24
Inspection Pigging Bayan-MLNG Project Supply gauge pig and personnel to assist pigs receipt and retrieval. Petronas Carigali Sdn Bhd Offshore, Sarawak 18"x80km BYN-MLNG1
PCSB SKO Pipeline Maintenance Programme Assist Operational Pigging Petronas Carigali Sdn Bhd - SKO Offshore, Sarawak PL291: 18" x 86km BYR-A to MLNG1
West Lutong Pipelines Replacement Project Cleaning, Gauging, Filling and Hydrotesting. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd / PBJV Group Sdn Bhd Offshore, Sarawak 10" x 2km WLDPA-WLDPB
PCSB SBO Pipeline Maintenance Programme Engineering and Design of Permanent Pig Traps 6", 8" and 10" Petronas Carigali Sdn Bhd Sabah 20 nos of pig traps
Transportation and Installation of Offshore Facilities - Sumandak Pipeline Phase 2 Flooding and Preservation Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sabah 10" & 4" x 4.5km SUPGB-SUJTC, 16" & 12" x 3.7km SUPGB-SUDPA, 8" x 4.5km SUJTC-SUPGB, 10" x 10km SMRA-SUPGB , 10" x 17.3km SMGA-SUPGB
Baram MCOT Pipeline Replacement Project Cleaning, Gauging, Hydrotesting and Bulk Dewatering. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 10" x 1.3km BAPAA-BADPG (Flexible risers)
Intelligent Pigging for Semarang Pipelines. Supply of equipment and personnel to assist Intelligent Pigging. Petronas Carigali Sdn Bhd / H.Rozen (M) Sdn Bhd Offshore, Sabah PL117: 6"x0.6km SMJTF-SMJTD, PL118: 6"x0.6km SMJTF-SMJTC, PL125: 8"x0.9km SMJTF-SMJTD & PL123: 8"x2.2km SMJTG-SMJTE
Semarang Pipeline Repair & Rejuvenation Project. Cleaning, Flushing and Assist Pumping the Intelligent Pigging Petronas Carigali Sdn Bhd Offshore, Sarawak PL114: 6" x 0.7km SMJTF-SMJTC, PL119: 6"x1.2km SMPA-SMJTE, PL129: 6"x1.7km SMPA-SMJTC & PL147: 8"x1.6km SMPA-SMPC
St Joseph - St Furious Development Project (Phase 2) Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Sabah Shell Petroleum Corporation / TL Offshore Sdn Bhd Offshore, Sabah 10" & 20" x 15km SFPA-SFKA
Semarang Pipeline Repair & Rejuvenation Project. Flushing Cleaning, Leak Testing, Dewatering, Drying & Nitrogen Packing. Petronas Carigali Sdn Bhd Offshore, Sarawak PL114: 6" x 0.7km SMJTF-SMJTC, PL119: 6"x1.2km SMPA-SMJTE, PL129: 6"x1.7km SMPA-SMJTC & PL147: 8"x1.6km SMPA-SMPC
West Lutong Pipelines Replacement Project Cleaning, Gauging, Filling and Hydrotesting. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd / PBJV Group Sdn Bhd Offshore, Sarawak 24" x 1.5km MCOT to open sea and 18" x 15km MCOT-WLDPA
Intelligent Pigging for Semarang Pipelines. Retrieval of Stucked IP. Petronas Carigali Sdn Bhd / Romstar Sdn Bhd Offshore, Sabah PL114: 6" x 0.7km SMJTF-SMJTC & PL127: 6" x 0.8km SMJTG-SMJTE.
Project Description Scope Of Work Owner / Client Location Length/Size
Baram MCOT Pipeline Replacement Project Petronas Carigali Sdn Bhd/TLO (Sub-contractor to TLO) Pre-Comm And Commissioning - Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing.   16" x 33km MCOT-Baram Platform, Offshore Sarawk at 0 to 40m water depth
PM3 - Ca Mau Gas Pipeline Project Provision for Hydrotesting, Pre-commissioning, Commissioning, Performance Test Run and Initial Operation PetroVietnam/VietSovPetro (As Sub-contractor to VSP) Onshore, Vietnam 18" x 300 km Offshore Pipeline, Landfall Station, 18" x 27km Onshore Pipeline, MLV Station and Matering Station, flat terrain & Swampy, Ca Mau Province Vietnam.
St Joseph - St Furious Development Project (Phase 1) Cleaning, Gauging, Filling, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Sabah Shell Petroleum Corporation / TL Offshore Sdn Bhd Offshore, Sabah 8" & 10" x 2km SFJTB-SFJTE
Sumandak Pipeline Precommissioning. Cleaning, Gauging, Filling, Hydrotesting and Bulk Dewatering. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 16" x 11.8km SMPB-SUDPA
Intelligent Pigging for Semarang Pipelines. Supply of equipment and personnel to assist Intelligent Pigging. Petronas Carigali Sdn Bhd / Romstar Sdn Bhd Offshore, Sabah PL114: 6" x 0.7km SMJTF-SMJTC and PL127: 6" x 0.8km SMJTG-SMJTE.
Abu Cluster Development Project Cleaning, Gauging, Filling & Hydrotesting of pipelines from platform to subsea PLEM. Petronas Carigali Sdn Bhd / APECS Offshore, Terengganu 6" x 2km & 8" x 2km AbA-PLEM
West Lutong Pipeline Abandonment Project Deoiling and preservation (in-place abandonment) of pipeline. Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak 10" x 2km & 6" x 2km WLDPC-WLDPA
PM3 - Ca Mau Pipeline Project Dewatering, Vacuum Drying, Nitrogen Packing, Gas-In & System Commissioning. PetroVietnam / VietSovPetro Onshore, Vietnam 18" x 298km BRB-LFS & 18" x 27km LFS-GDS
Bokor Pipeline Emergency Repair Project Deoiling Flushing & Leak Testing Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 10" x 1km BoA-BoD
SeligiA-RayaA Pipeline Abandonment Project Deoiling and preservation (in-place abandonment) of pipeline. ExxonMobil Exploration & Production Malaysia Incorporated Offshore, Terengganu 16" x 28km RaA-SeA
B11-B12 Field Pipeline Development Project Cleaning, Gauging, Filling, Glycol Swabbing & Nitrogen Dewatering of CRA Clad Pipelines. Sarawak Shell Berhad / TL Offshore Sdn Bhd Offshore, Sarawak 14" x 11km Subsea Wellhead-B11DRA & 8" x 25m Subsea Jumper
West Lobe Pipeline Development Nitrogen Dewatering Premier Oil Natuna BV / Nippon Steel Corporation Offshore, Indonesia 14" x 800m Subsea PLEM-WLWH Platform
Baram MCOT Pipeline Replacement Project Cleaning, Gauging, Hydrotesting and Bulk Dewatering. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 10" x 11km BAPAA-BAPB
SSB 2005 Offshore Installation Project Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Sarawak Shell Berhad / TL Offshore Sdn Bhd Offshore, Sarawak 28" x 0.8km E11VB-E11PB & 28" x 42km E8DRA-E11PB
ANDRA Platform Washdown Project Water Jetting and Manual Cleaning of Platform Structures and Topside System Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd Offshore, Terengganu ANDRA Platform
Baram MCOT Pipeline Replacement Project Cleaning, Gauging, Hydrotesting and Bulk Dewatering. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 16" x 33km MCOT-BAPAA
SDV Replacement Project Nitrogen and water pigging isolation for replacement of SDVs during shutdown and gas re-commissioning. Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd Offshore, Terengganu 12" Masa, 18" Bekok C & 24" Duyong; to SCP
Project Description Scope Of Work Owner / Client Location Length/Size
Pulai A - Pulai B Pipeline Preservation Project Deoiling and Wet Preservation Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd Offshore, Terengganu 4" x 2km PuA-PuB
Baram South Pipeline Project Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 16" x 4km & 6" x 4km BAJTH-BAKPB
Kepong A-Tiong A Pipeline Rejuvenation Project Deoiling and Hydrotesting Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd Offshore, Terengganu 10" x 7km KeA-TiA
Truck Tank Loading Rack Project Flushing and Hydrotesting Petronas Dagangan Bhd/ Baxtech Resources Sdn Bhd Onshore, Terengganu 2" upto 8" various lengths
NGDS to Keluang FL/DL Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd Onshore, Johor 6" x 1km
Baram Field Pipeline Repair Project Deoiling, Hydrotesting, Gauging and Intelligent Pigging. Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak PL11:12"x10km BADPA-BADPB
Bakau-West Lutong Field Pipeline Abandonment Project Deoiling Flushing and Pigging Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak PL5:16” x 18km BKPA-WLPA
West Lutong-MCOT Pipeline Abandonment Project Deoiling Flushing and Pigging Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak PL231:10" x 12.5km WLPA-MCOT
Semarang Field Pipeline Repair Project Leak Finding Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore-Onshore, Sabah PL187:6" x 1.7km Gaslift Pipeline SMPC-SMPA
Natural Gas Distribution System To Puchong DL Stage 1/05. Cleaning, Pneumatic Testing, Nitrogen Drying & Nitrogen Packing Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd Onshore, Selangor PE pipe: 125mm x 835m & 63mm x 50m
Natural Gas Distribution System to Parit Buntar FL Stage 1/05 Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd Onshore, Perak 6” x 204m & 4" x 300m
Pre-Commissioning of F13/E11K-A Pipeline Cleaning, Gauging, Hydrotesting, Air Drying, Nitrogen Packing and Intelligent Pigging Sarawak Shell Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 16” x 10.8km F13W to E11K-A
Pre-Commissioning of Semarang LGAST Pipeline Dewatering, Air Drying, Nitrogen Slugging and Gas-In Commissioning. Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore-Onshore, Sabah PL107: 14” x 56km SMR-A to LGAST
Pre-Commissioning Of Semarang LCOT Pipeline Cleaning, Gauging and Hydrotesting Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore-Onshore, Sabah PL144: 20” x 48km SMR-A to LCOT & PL133: 8" x 3.5km SMP-A to SMR-A
Baram Field Crude Oil Evacuation Deoiling and Leak Testing of inter-field pipelines Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak 6 nos of 8"x3km and 4 nos of 10"x3km
Pre-Commissioning of Semarang LGAST Pipeline Degassing, Cleaning, Gauging and Intelligent Pigging Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore-Onshore, Sabah PL107: 14” x 56km SMR-A to LGAST
Natural Gas Distribution System To Teluk Kalong FL Stage D3/04. Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd Onshore, Terengganu 4” x 70m
Natural Gas Distribution System To Kuantan Port FL Stage D3/04. Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd Onshore, Pahang 4” x 468m
Semarang Field Crude Oil Evacuation Deoiling and Preservation of inter-field pipelines and Topsides facilities Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sabah 3 nos of 8” x 4km (PL133, PL133A, PL139), 1 no of 12"x4km (PL143) and SMP-A, SMR-A, SMP-B & SMP-C topsides
Baram Field Pipeline Abandonment Project Deoiling Flushing and Pigging Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore-Onshore, Sarawak PL287: 16” x 40km BAP-AA to MCOT
Baram Field Pipeline Repair Project Re-flooding and Hydrotesting Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak 8” x 2.0km BAJT-D to BADP-A
Natural Gas Distribution System To Seberang Prai FL1/DL1 Cleaning, Hydrotesting, Pneumatic, Dewatering, Swabbing, Air Drying, Nitrogen Drying & Nitrogen Packing Gas Malaysia Sdn Bhd / PTIS-Baxtech JV Sdn Bhd Onshore, Penang 8” x 700m Steel, 125mm x 1.8km & 90mm x 800m PE
Project Description Scope Of Work Owner / Client Location Length/Size
Bokor Field Pipeline Repair Project Deoiling Flushing and Pigging and Leak Testing Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak 10” x 700m
Enhanced Cleaning Cleaning Pigging and Intelligent Pigging Petronas Carigali Sdn Bhd / ExxonMobil Exploration & Production (M) Inc / GE Energy Sdn Bhd Offshore, Terengganu 16" x 48km ANDR-A to Tapis-D
Enhanced Cleaning, Tapis Platform Cleaning Pigging prior to Intelligent Pigging Petronas Carigali Sdn Bhd / ExxonMobil Exploration & Production (M) Inc / GE Energy Sdn Bhd Offshore, Terengganu Various Sizes Pipelines
St Joseph Pipeline Recovery Project Hydrotesting Sarawak Shell Bhd / TL Offshore Sdn Bhd Offshore, Sarawak 6” x 1.6km
Baram Field Pipeline Repair Project Deoiling Flushing and Pigging and Leak Testing Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sarawak PL296: 10” x 2km BADP-A to BAP-AA
Semarang Field Pipeline Abandonment Project Deoiling Flushing and Pigging and Intelligent Pigging Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore-Onshore, Sabah PL144: 18” x 48km SMR-A to LCOT
Ruby-A Modification Project Chemical Cleaning and Leak Testing Petrovietnam / Petronas Carigali Sdn Bhd / Shapadu Energy & Engineering Sdn Bhd Offshore, Vietnam Various sizes and length topside pipings.
Pulai Field Pipeline Rejuvenation Project Cleaning and Hydrotesting Petronas Carigali Sdn Bhd / GE Energy Sdn Bhd Offshore, Terengganu 4” x 1.7km Pulai-A to Pulai-B
Semarang Field Pipeline Repair Project Deoiling Pigging and Hydrotesting Petronas Carigali Sdn Bhd / Allied Marine & Equipment Sdn Bhd Offshore, Sabah PL139: 8” x 4km SMR-A to SMP-B
2004-2006 Transportation And Installation Of Offshore Facilities for PCSB - Pre-commissioning Cleaning, Gauging, Hydrotesting and Dewatering Petronas Carigali Sdn Bhd / TL Offshore Sdn Bhd Offshore, Sabah/Brunei 14" x 14km, 10" x 14km and 8" x 8km
Jintan Pipeline Re-Installation Project Hydrotesting and Dewatering with Nitrogen and Production Gas Commissioning Sarawak Shell Bhd / Nippon Steel & Construction (M) Sdn Bhd Offshore, Sarawak 24” x 8km CRA Clad Pipeline M1DR-A to JNDR-A
ANGSI Field Platform Washdown Water Jetting and Manual Cleaning of Platform Structures and Topside System Petronas Carigali Sdn Bhd / Vastalux Sdn Bhd Offshore, Terengganu ANDP-C, ANDP-B and ANDP-E Platform
Natural gas Distribution System To Cheng FL1/DL1 Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd/ MMC Engineering & Construction Sdn Bhd Onshore, Melaka 4”, 6”, 8” x 11km inclusive PE Pipeline
NGDS To Ayer Keroh FL1/DL1 Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd/ MMC Engineering & Construction Sdn Bhd Onshore, Melaka 4”, 6”, 8” x 13km inclusive PE Pipeline
Natural Gas Distribution System to Segambut Looping. Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying & Nitrogen Packing Gas Malaysia Sdn Bhd/ Giman Construction Sdn Bhd Onshore, Kuala Lumpur 8” x 1.2km & 4" x 50m
South Jambi “B” Shallow Gas Project Final Swabbing, Dust Removal, Air Drying, Nitrogen Packing and Gas-In Commissioning. ConocoPhillips Indonesia/ Tripatra Engineers & Constructors Onshore, Sumatera Indonesia 10” x 60km Sales Gas, 4"x33km Condensate & 8"x12km Flowline
Coflexip Pipeline Abandonment Deoiling Pigging of Coflexip Hose Talisman (M) Ltd/ Bumi Armada Navigation Sdn Bhd Offshore, Kelantan 10” x 2km BK-A to FPSO
Transportation And Installation Of Offshore Facilities Package 4 - Kinarut Pipeline Nitrogen Slugging and Gas-In Commissioning. Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd Offshore, Sabah 16” x 40 km
Project Description Scope Of Work Owner / Client Location Length/Size
Transportation And Installation Of Offshore Facilities Package3 - Kinarut Pipeline Cleaning, Gauging, Hydrotesting, Dewatering and Air Drying. Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd Offshore, Sabah 16” x 40 km
Erb West Pipeline Project. Cleaning, Gauging, Hydrotesting, Dewatering, Intelligent Pigging, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd Offshore, Sabah 6” x 3.5 km ERWB-ERWA
Transportation And Installation Of Offshore Facilities Package4 ANGSI 2003 Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd Offshore, Terengganu 6” x 4.1 km, 6"x11km, 2nos 10"x10km and 2nos 10" x 8km interfield pipelines
Transportation And Installation Of Offshore Facilities Package-2 Resak Development Project Cleaning, Gauging, Hydrotesting, Dewatering and Vacuum Drying. Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd Offshore, Terengganu 24” x 157km
Transportation And Installation Of Offshore Facilities Year 2003-MLNG-3 Phase-2 Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test. Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd Offshore, Onshore, Sarawak 24” x 42 km B1DRA-HCP, 30"x155km M1-E11RC & 32"x120km E11RC-MLNG3.
Gas Transmission And Distribution Project- Grissik Sakra Vacuum Drying, Nitrogen Packing and Gas-In Commissioning. P.T Perusahaan Gas Negara, Indonesia Onshore, Indonesia /Singapore 28” x 487 km
Bekok C Platform Modification Project. Chemical Cleaning and Lube Oil Flushing. Petronas Carigali Sdn Bhd/ Shapadu Energy & Engineering Sdn Bhd Offshore, Terengganu Various sizes topside piping.
Project Description Scope Of Work Owner / Client Location Length/Size
Temana Pipeline Project Cleaning, Gauging, Hydrotesting, Dewatering, Intelligent Pigging, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd/ Nippon Steel Construction (M) Sdn Bhd Offshore, Sabah 6” x 3.5 km
Transportation And Installation Of Offshore Facilities Year 2002 - MLNG-3 Phase 1 Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test. Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd Offshore, Onshore, Sarawak 32” x 120 km E11RC-MLNG3 & 28"x3.5km E11RB-E11RC
Project Description Scope Of Work Owner / Client Location Length/Size
Angsi Development 2001 Offshore Pipeline Project Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test, including Leak Finding. Petronas Carigali Sdn Bhd/ ExxonMobil Exploration & Production (M) Inc/ TL Offshore Sdn Bhd Offshore, Terengganu 24” x 82 km ANDRA-SEA, 16"x46km ANDRA-TaD, 16"x48km PuA-DyA and 16", 12", 6"x7km ANDRA-ANDPB
Kulim Lateral Pipeline Project Cleaning, Gauging, Hydrotesting, Dewatering, Caliper Survey, Air Drying and Nitrogen Slugging Prior to Gas-In Commissioning. Petronas Gas Bhd/ Saga Dialog Sdn Bhd Onshore, kedah 24” x 10 km
Testing And Commissioning Of Slug catcher Gas Metering Stations, Spillover Associated Facilities for MLNG Pipeline Project Flushing, Hydrotesting, Air Drying, Nitrogen Packing, Reinstatement Test, Manual Tank Cleaning Petronas Carigali Sdn Bhd/ Ranhill Engineers And Constructors Sdn Bhd Onshore, Sarawak 1"-52" various lengths piping and tanks.
Ethane Gas Pipeline Project Cleaning, Gauging, Hydrotesting, Dewatering, Caliper Survey, Air Drying and Nitrogen Packing. Petronas Gas Bhd/ Projass Engineering Sdn Bhd Onshore, Terengganu 12” x 10 km & 4"x1km
Cabot Offshore Terminal Pipeline Repair Project. Bi-directional Pig Plugging to Cut Out Dented Section and Hydrotesting. Syarikat Bena Pakat Sdn Bhd / Cabot Sdn Bhd Onshore, Offshore, Negeri Sembilan 20” x 10 km & 10" x 10km PLEM-Plant
Project Description Scope Of Work Owner / Client Location Length/Size
Serdang Power Station Chemical Cleaning Equipment & Piping System to Turbine. Siemens (M) Bhd/ Tenaga Nasional Bhd Onshore, Selangor various sizes and length
NGDS To PRSS, Bangi . Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/ K & K Sepadu Sdn Bhd Onshore, Selangor 6” x 2 km
EPCC Of Gas Pipeline Relocation Work at Jalan Kebun, Klang Selangor Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/ Pigas Engineering Sdn Bhd Onshore, Selangor 8” x 4 km
Angsi Development 2000 Offshore Pipeline Project Cleaning, Gauging, Hydrotesting, Dewatering, Vacuum Drying, Hook-up, Reinstatement and Reinstatement Test. Petronas Carigali Sdn Bhd/ ExxonMobil Exploration & Production (M) Inc/ TL Offshore Sdn Bhd Offshore, Terengganu 32"x160km OSC-ANDRA & 32"x56km GuD-ANDRA
Natural Gas Pipeline Relocation Work at South Klang Valley Expressway Kajang, Selangor Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/ Diversified Eng Sdn Bhd Onshore, Selangor 8” x 2 km
NGDS to Cyberjaya Development Area (Phase 1-Stage 1) Sepang . Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/ Right Gas Sdn Bhd Onshore, Selangor 16” x 7 km
Titan OSBL Pipeline & Terminal, Project . Cleaning, Hydrotesting, Dewatering, Caliper Survey, Air Drying & Nitrogen Packing Titan (M) Ltd/ Eastern Soldar Engineering Sdn Bhd Onshore, Johor 12 x 1.5 km
Semarang Pipeline Repair Project. Cleaning, Gauging, Hydrotesting, Dewatering, Air Drying and Nitrogen Packing. Petronas Carigali Sdn Bhd/ TL Offshore Sdn Bhd Offshore, Sabah 6” x 5 km
NGDS Putrajaya Phase 1B, Stage 1, Precint 2 & 16 Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/ Pi-Gas Engineering Sdn Bhd Onshore, Selangor 16” x 10 km
NGDS to Parcel B,Putrajaya Cleaning, Pneumatic Testing, Nitrogen Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/ Gas Supply Sdn Bhd Onshore, Selangor NPS 6 x 4 km MDPE Piping
NGDS to Bukit Raja FL11/DL11 (Power Cable) Bukit Raja Industrial Area Klang Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd, Diversified Engineering & Construction Sdn Bhd Onshore, Selangor 8” x 5 km
Gelugor Submarine Mainline Project . Cleaning, Hydrotesting, Dewatering, Air Drying, Nitrogen Packing and Gas-In Commissioning. Petronas Gas Bhd/ Pi-Gas Engineering Sdn Bhd Onshore, Penang 24” x 10 km
NGDS to Bangi Industrial Area (BFL 2) Bangi . Cleaning, Hydrotesting, Dewatering, Swabbing, Air Drying and Nitrogen Packing. Gas Malaysia Sdn Bhd/Right Gas Sdn Bhd Onshore, Selangor 16” x 5 km
EPCC of the Gelugor TNB Meter Station Project. Air Flushing and Air Drying. Petronas Gas Bhd/ Ho Hup Engineering & Construction Bhd Onshore, Penang Metering Station and Associated Piping.